Laserfiche WebLink
•Dania Beach Drainage Improvements – West Lake - PDS served as the Design Engineers and <br />Project Managers for this project to provide drainage improvements to a neighborhood <br />community in Dania Beach prone to flooding. The neighborhood located west of West Lake is <br />a low lying community just several inches above sea level and suffers from intense flooding <br />during times of heavy rains coinciding with high tides. The project included the drainage system <br />including drainage wells, exfiltration trench, piping and master drainage pumps discharging <br />into the existing West Lake. This neighborhood of over 500 acres (roughly three quarters of a <br />square mile), is a high profile area that has been the subject of many news reports over the <br />past several years. <br />•City Center Master Infrastructure Pembroke Pines, Florida - (PDS) current staff served as the <br />Design Engineers, Project Managers and Construction Managers for this project to provide <br />master infrastructure improvements for the Pembroke Pines City Center located at the <br />intersection of Pines Boulevard and Palm Avenue adjacent to the existing City Hall. The project <br />included the drainage system including lakes and mitigation area, the potable water system, <br />sanitary sewer system including pump station, roadway design and pavement marking and <br />signage. The infrastructure was designed for intended function of providing the overall services <br />needed for the City Center and total build-out. <br />•Taylor Lane Roadway Improvements, City of Dania Beach - Taylor Lane is a 2,000 linear foot <br />section of roadway located in the City of Dania Beach adjacent to the Fort Lauderdale <br />Hollywood International Airport and the Dania Cut-Off Canal and associated Marinas. As part <br />of the development of the south runway extension at the airport, stormwater run-off was re- <br />directed and has adversely impacted Taylor Lane. This roadway provides the only access to <br />the marinas located on the north side of Dania Cut off Canal west of US 1. <br />•Miramar Pineland Natural Area, City of Miramar - The proposed project includes <br />renovating/remodeling of the existing recreation building, demolishing the existing tennis <br />courts, playground, fencing and any other features not designated to remain and constructing <br />a new parking lot and pavilion, refurbishing an existing pavilion, installation of new sports court <br />lighting, along with associated site improvements including but not limited to parking lot and <br />hardscape improvements, lighting, fencing, landscaping, irrigation, lightning <br />prediction/detection, site video surveillance and WiFi. <br />•Town of Miami Lakes (Phase I) - Transit Improvements at City Bus Stops – Performed Land <br />Surveying, Existing Underground utility Investigation, Civil Engineering, Electrical Design, <br />Structural Design and Construction Administration at 11 locations throughout the Town. <br />•Master Lift Station 11c Upgrades and Rehabilitation – City of Opa-Locka – This project includes <br />renovation and upgrades to the City’s largest lift station, responsible for collecting and pumping <br />most of the City’s sewer into Miami-Dade County System. Project included building <br />renovations, new pumps and standby generator. <br />•Miami-Dade Water & Sewer – GIS Input of all Miami Spring Assets – Performed GIS Input of <br />all existing water and sewer utilities within the City of Miami Springs, digitized as-built, field <br />location of utilities & Conflict resolution. <br />Proposer’s experience, past performance, financial capabilities, <br />violations, and litigation. <br />RFQ No. 20-07-01 <br />City of Sunny Isles Beach Beach <br />August 2020 120