My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc (reduced)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Premiere Design Solutions, Inc (reduced)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:53:24 AM
Creation date
8/21/2020 10:48:43 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> LIFTED PARK <br /> <br /> <br />OWNER <br />City of Miami Gardens Park & <br />Recreation Dept. <br /> <br />CLIENT CONTACT <br />Helen Gray <br /> Calvin, Giordano & Associates, Inc. <br />(City of Miami Gardens) <br /> <br />CONSTRUCTION BUDGET/COST <br />$ 1,000.000.00 <br /> <br />COMPLETION DATE <br />October 2019 <br /> <br />DESCRIPTION <br />The intent of the project is to construct additional parking spaces within the park facility, just south of the <br />existing guardhouse. In addition, an overflow parking area is proposed along the existing curve behind the <br />restroom building. This project will add 38 newly paved parking spaces and will include the use of asphalt <br />pavement, concrete curbs, concrete sidewalks, pavement markings, and signage. <br /> <br />Premiere Design Solutions role in the project is: <br /> <br /> Lead Civil Engineer and Project Manager for Planning, Estimating, Design, Permitting and <br />Construction Services. <br /> Progress meetings with City’s staff and commissioners to provide updates of work performed. <br /> Permit and Construction Document Review meeting with City Staff. <br /> Bidding and Construction Administrative Services as the Owner representative for the City of <br />Miramar. <br /> <br />Premiere Design Solutions Staff’s role in the project was: <br /> Site Engineering Design to include the design of the proposed nineteen (19) parking space lot <br />located northwest of Shelter No. 1. <br /> Site Engineering Design to include the design of approximately nineteen (19) proposed overflow <br />parking spaces located along the existing sealed curved entrance drive from University Drive. <br /> Engineering Design and Analysis shall include the pavement, storm-water, pavement markings, <br />and street signage. <br /> A storm-water Pollution Prevention Plan has been prepared as part of the design. <br /> <br />Bennett Lifter Park. <br />City of Miami Gardens. <br />Miami Dade County, Florida <br />136
The URL can be used to link to this page
Your browser does not support the video tag.