Laserfiche WebLink
q Felix De la Noval, PE, LEED AP BD+C <br />VAN D E RW E I L Senior Electrical Engineer <br />Overview <br />Felix is a Senior Electrical Engineer with over 30 years of experience in the field <br />.1 of electrical engineering and lighting design. He specializes in power distribution <br />1 and controls, technological upgrades and retrofit, audio, telecommunications, <br />security and fire protection as well as energy audits and conservation for <br />government and commercial projects. <br />r ' <br />RIV <br />Related Project Experience <br />Y4. <br />City of Miami, Department of Environmental Resource Management, <br />Laboratory Fume Hoods Replacement, Miami, FL <br />Education <br />Replacement of eight existing fume hoods with new Kewaunee Scientific <br />fume hoods within four labs along with replacing the existing ductwork. <br />B.S., Electrical Engineering, <br />University of Havana, 1972 <br />U.S. Department of Homeland Security, United States Coast Guard, H <br />Irma Station, Marathon, FL <br />Registrations <br />Engineering design services for the renovation of the Station Marathon <br />for the U.S. Department of Homeland Security, United States Coast <br />Professional Engineer (Electrical): <br />Guard. The site is made up of several buildings, including a two-story <br />FL <br />administration building, single -story office and storage building, and a <br />boathouse which is a single -story building that houses a repair shop, and <br />LEED AP BD+C <br />storage. The scope of design consists of interior renovation, infrastructure <br />enhancements, fuel farm replacement, exterior lighting replacement and <br />complementary plumbing, as well as mechanical and electrical power work <br />for all buildings on the campus. <br />• Indian River State College, Building N, Science Building and Chiller <br />Plant Engineering Due Diligence, Fort Pierce, FL <br />MEP/FP engineering due diligence services to an existing 3 -story, 30,000 <br />sf Science building "N" which includes chemistry, biology and physics labs <br />to evaluate the utilities and infrastructure and to support converting the <br />heating hot water system to electric and removing the above ceiling AHUs <br />and moving them into new mechanical rooms. <br />• Indian River Medical Center, New Interventional Stroke Center, Vero <br />Beach, FL <br />New bi-plane operating room including an equipment and control room, <br />soiled room, clean room, patient toilet and 8 bed prep/recovery suite <br />with a nurses station and patient toilet room in the interventional stroke <br />department on the 2nd floor of the hospital. <br />• Indian River State College, Building "O" Chiller Plant Upgrades, Fort <br />Pierce, FL <br />The "O" Building Chiller Plant serves various buildings throughout the <br />campus and including the new 50,000 sf WorkForce Training Center. The <br />mechanical scope includes replacing existing chiller number 2 and chiller 3, <br />along with the associated cooling towers and primary and condenser water <br />pumps with two new centrifugal chillers. Electrical scope includes replacing <br />the breakers in Main Distribution Panels (MDP) 1 and 2 serving the chillers, <br />cooling towers, and pumps. <br />• University of Miami, Medical Campus Master Plan, Miami, FL <br />Master plan for the University of Miami Medical Campus and satellite <br />buildings in South Florida included a high-level overview of the major MEP/ <br />FP/T infrastructure to support the university's projected growth over the <br />next 10 years. This project included a master plan and assessment of the <br />infrastructure and facilities condition. The project also included a review <br />of the building and facilities assessment prepared by Accruent, a physical <br />resource management system, to determine if any gaps existed. <br />26 <br />