My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc (reduced)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Premiere Design Solutions, Inc (reduced)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:53:24 AM
Creation date
8/21/2020 10:48:43 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> RFQ No. 20-07-01 <br />City of Sunny Isles Beach Beach <br />August 2020 <br /> <br />D – Project Approach and Understanding <br /> <br />In addition to this, we implement a flow chart process <br />to route technical documents and plans through <br />several iterations of reviews until the PDS quality is <br />reached. <br />The box to the right of the following page is a sample <br />of a Quality Control flow chart customized for a <br />design project PDS is working on with Broward <br />County Transit. A similar flow chart would be <br />developed for this project, to make sure we <br />customize the process to make it fit the specific <br />requirements of this project. <br />So we have mentioned key features of our approach, <br />including a single point of communication, seamless <br />teamwork and a sound quality control process. But <br />our approach includes other aspects that help ensure <br />a successful completion of projects. Our experienced <br />professionals will provide the City with the following: <br /> Provide single point of contact and responsibility <br /> Ensure teamwork including City staff <br /> Coordinate with City Staff <br /> Provide project management <br /> Provide design phase management <br /> Manage the schedule and control project costs <br /> Enforce Quality Assurance/Quality Control <br />(QA/QC) <br /> Provide public communication and outreach <br /> Provide construction management support <br />Technology offers great tools for engineering, so why <br />not take advantage of them? As a twenty-first <br />century company, PDS strongly believes on <br />technological aides and advances, and is equipped <br />with the latest technology in computer hardware and <br />software. <br /> <br />31
The URL can be used to link to this page
Your browser does not support the video tag.