Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Luis J. Jurado, P.E. <br />13. ROLE IN THIS CONTRACT <br />Survey Principal / QA/QC <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />17 <br />b. WITH CURRENT FIRM <br />13 <br />15. FIRM NAME AND LOCATION (City and State) <br />Premiere Design Solutions, Inc. – North Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. Civil Engineering, University of North Carolina <br />at Charlotte <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer <br />Florida No.66396 - South Carolina No. 28394 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Florida Engineering Society, National Society of Professional Engineers, ASCE Member <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Broward County Transit – Professional Services Agreement in an <br />Ongoing Basis, Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />The Transit Infrastructure & Shelter Improvement at Bus Stops is a multi-year project consisting of improving transit facilities <br />throughout Broward County. The scope of work for this project can be subdivided into ADA Improvements at Bus Stops, Bus <br />Shelter Expansion Program, Bus Bay Enhancements and Transit Terminal Improvements. For these projects, Mr. Jurado has <br />served as project director and Engineer of Record for most of the work provided under this contract including land surveying, <br />conducted site condition assessments, engineering design, and permitting coordination for sidewalk repair and improvements <br />projects at over 1,000 locations throughout Broward County, including ADA compliant pedestrian curb ramps, new bus shelter <br />site design maintaining proper sight triangle, ADA Accessibility and pedestrian safety. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT Minor Highway Transit Enhancements, Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Project included design services, permitting and construction management services for the improvement at 73 locations along <br />FDOT right-of-way in Broward County, FL. This Design-Build Project included the enhancement of transit facilities, including <br />ADA improvements, utility coordination, civil design, permitting and construction inspections. This project also included the <br />design of custom made state of the art bus shelter facilities to replace exiting or be added at these locations. Mr. Jurado was <br />responsible for presenting a work program to ensure completion within the expected Client’s schedule, project team <br />coordination and rigorous quality control. The project total cost was $2.5 Million. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Citywide Sidewalk Assessment Survey, City of Fort Lauderdale, <br />FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />As part of the comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk <br />Assessment Program. The work included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report <br />with sidewalk deficiency, photo and GIS location, type, and length of damage. Mr. Jurado was responsible for the coordination <br />of work, training and field data collection of filed survey activities, and assisted field crews in the collection of data and <br />assessing the existing condition of miles of existing sidewalks and pedestrian curb ramps. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />City-Wide Roadway Topographic Surveys for CIP Projects, City of <br />Opa-Locka, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Jurado was the Project Principal for this surveying project to conduct City-wide surveys on 200,000 LF of roadways as part <br />of the CIP program to improve water and sewer infrastructure and provide additional stormwater management. This project <br />has been performed with the latest GPS equipment and data collectors, coordinating field crews and office drafting work to <br />meet the very demanding client schedule of completion. Surveys include ROW to ROW above ground features, drainage and <br />wastewater structure information, delineation of plats and generating survey drawings. Mr. Jurado coordinated deliverables <br />with client and conducted deliverable QA/QC reviews of project deliverables and coordinated comment resolution from client <br />and owner. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />GIS Services for Miami Springs Infrastructure for MDWASD, <br />Miami-Dade Water and Sewer, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Jurado was the Project Coordinator for implementation of the Department’s GIS system for water and sewer infrastructure, <br />with the priority of Miami Springs acquired utilities. To achieve this, Mr. Eckardt oversaw six GIS Specialists working at WASD <br />entering water and sewer information into the WASD GIS System with GAMS and EAMS. Project also includes field data <br />collection and as-built plans research to collect all the required information necessary for the input of all water and sewer <br />infrastructure in Miami Springs. <br />73