Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Gustavo A. Eckardt. P.E. <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />18 <br />b. WITH CURRENT FIRM <br />10 <br />15. FIRM NAME AND LOCATION (City and State) <br />Premiere Design Solutions, Inc. – North Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. Civil Engineering, University of North Carolina <br />at Charlotte <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer <br />Florida No.67553 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Florida Engineering Society, Chi Epsilon Civil Engineering Honor Society, National Society of Professional <br />Engineers, Primavera P3 Scheduling Training, MOT Training Course <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Hard Rock Stadium Pedestrian Bridges and Tunnels, City of <br />Miami Gardens, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Eckardt was the project manager and engineer of record for this project which the preparation of specific purpose surveys <br />at four locations at the Hard Rock Stadium, drainage design and underground utility investigation and design. The project had <br />a very aggressive schedule, requiring to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation <br />of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the dedication of <br />land and aerial easements for the new structures in private property. The project total cost is $16 Millions. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Roadway Segment Surveying Services for DCP, City of Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Eckardt was the Project Manager for the preparation of over 15,000 LF of roadway surveys from Right-of-way (ROW) to <br />ROW on city of Miami 30 independent street segments, including collection of all above ground features, elevations cross <br />sections at every 100’, including information for sanitary sewer and drainage structures such as bottom, invert, size and <br />direction. Mr. Eckardt coordinated with client delivery schedules and assigned survey crews to meet the aggressive schedule. <br />Mr. Eckardt also conducted QA/QC reviews of deliverables and coordinated the resolution of client comments and requests on <br />survey drawings. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Broward County Transit – Professional Services Agreement in an <br />Ongoing Basis, Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />The Transit Infrastructure & Shelter Improvement at Bus Stops is a multi-year project consisting of improving transit facilities <br />throughout Broward County. The scope of work for this project can be subdivided into ADA Improvements at Bus Stops, Bus <br />Shelter Expansion Program, Bus Bay Enhancements and Transit Terminal Improvements. For these projects, Mr. Eckardt has <br />provided surveying coordination, site condition assessments, engineering support, design and permitting coordination for <br />sidewalk repair and improvements projects at over 1,000 locations, including ADA compliant pedestrian curb ramps, new bus <br />shelter site design maintaining proper sight triangle, ADA Accessibility and pedestrian safety. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />City-Wide Roadway Topographic Surveys for CIP Projects, City of <br />Opa-Locka, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Eckardt was the Project Manager for this surveying project to conduct City-wide surveys on 200,000 LF of roadways as <br />part of the CIP program to improve water and sewer infrastructure and provide additional stormwater management. This <br />project has been performed with the latest GPS equipment and data collectors, coordinating field crews and office drafting <br />work to meet the very demanding client schedule of completion. Surveys include ROW to ROW above ground features, <br />drainage and wastewater structure information, delineation of plats and generating survey drawings. Mr. Eckardt has been <br />responsible for coordinating field crew schedule and ensure completion dates are met as required by client. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />GIS Services for Miami Springs Infrastructure for MDWASD, <br />Miami-Dade Water and Sewer, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Eckardt was the Project Manager for implementation of the Department’s GIS system for water and sewer infrastructure, <br />with the priority of Miami Springs acquired utilities. To achieve this, Mr. Eckardt oversaw six GIS Specialists working at WASD <br />entering water and sewer information into the WASD GIS System with GAMS and EAMS. Project also includes field data <br />collection and as-built plans research to collect all the required information necessary for the input of all water and sewer <br />infrastructure in Miami Springs. <br />74