Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Jorge Michel Olmo <br />13. ROLE IN THIS CONTRACT <br />Chief Surveyor <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />20 <br />b. WITH CURRENT FIRM <br />7 <br />15. FIRM NAME AND LOCATION (City and State) <br />Premiere Design Solutions, Inc. – North Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.A. Architecture, Central University of Villa Clara, <br />Cuba <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Specialized Computer Aided Design & Drafting, Autodesk Technical Institute, Malaga, Spain 2010 <br />Online Web Courses – Implementing New CAD Techniques (Tips and Shortcuts / Last Versions) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Hard Rock Stadium Pedestrian Bridges and Tunnels, City of <br />Miami Gardens, Florida. <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Olmo was Survey crew lead for the preparation of specific purpose surveys at four locations at the Hard Rock Stadium, for <br />a very aggressive schedule project to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation <br />of the Superbowl LIV. Mr. Olmo collected above ground and aerial features for the project area and included utility information <br />such as manhole inverts, above ground signs, valves, ground cover, elevations, etc The project total cost is $16 Millions. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Sidewalk Assessment and GIS Representation, City of Fort <br />Lauderdale, Broward County <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the <br />City of Fort Lauderdale, which consists of over 400 miles of concrete sidewalks. Mr. Olmo was responsible for field data <br />collection utilizing GPS devices, with picture taking capabilities, that would later sync data collected with the GIS application <br />developed for this project. Mr. Olmo assisted in the calculation of progress utilizing GIS tools build into the GIS application. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Roadway Segment Surveying Services for DCP, City of Miami, <br />FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Olmo was Crew Party Chief responsible to collect field data of over 15,000 LF of roadway surveys from Right-of-way <br />(ROW) to ROW on city street segments, including all above ground features, elevations cross sections at every 100’, collection <br />of all above ground features within survey area, including information for sanitary sewer and drainage structures such as <br />bottom, invert, size and direction. Mr. Olmo led his crews to collect data necessary for developing survey drawings including <br />elevations to develop a digital terrain model of all street segments and created and set baselines along all of the 3o roadway <br />segments surveyed and included in this project. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />City-Wide Roadway Topographic Surveys for CIP Projects, City <br />of Opa-Locka, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements <br />as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide <br />design criteria packages for the letting of this work. Mr. Olmo was the crew lead to collect all the invert elevations, direction <br />and bottom elevations of all drainage structures and sanitary sewer structures within the project. Mr. Olmo was also <br />responsible for locating lot corners and establishing property lines and right of way lines based on plat records and available <br />information. Mr. Olmo also assisted in collecting all above ground features, elevations and commanding a second crew as <br />needed to meet project schedules. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Various Roadway Intersections Surveys, Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade <br />County. Mr. Olmo was tasked with collecting field data and drafting the topographic surveys which required the completion of <br />five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant <br />topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal <br />drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, as required. <br />75