Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Henry Rivera <br />13. ROLE IN THIS CONTRACT <br />Survey Crew / CAD Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />40 <br />b. WITH CURRENT FIRM <br />12 <br />15. FIRM NAME AND LOCATION (City and State) <br />Premiere Design Solutions, Inc. – North Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. Industrial Engineering, Santander Industrial <br />University, Bucaramanga, Colombia <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Master of Science in Industrial Engineering, University of Pittsburgh, 1978 <br />Master of Science in Mathematical Statistics University of Chile, Santiago de Chile, Chile 1971 <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Broward County Transit – Professional Services Agreement in <br />an Ongoing Basis, Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL <br />SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />This project is a multi-year project consisting of designing Transit Improvements throughout Broward County that are to be <br />compliant with ADA guidelines and regulations. One of the main objectives of the program is to provide ADA accessibility to <br />thousands of bus stops within the County. The project includes surveying, engineering design for improvements such as <br />landing pads, shelter pads, curb & gutter, sidewalk restoration, sidewalk transitions, etc. Mr. Rivera’s duties and responsibilities <br />include the preparation of topographic surveys and hundredths of locations and assist with the computer generated drawings <br />and engineering design drawings utilizing AutoCAD Civil 3D. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Sidewalk Assessment and GIS Representation, City of Fort <br />Lauderdale, Broward County <br />(2) YEAR COMPLETED <br />PROFESSIONAL <br />SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the <br />City of Fort Lauderdale, which consists of over 400 miles of concrete sidewalks. Mr. Rivera was responsible for field data <br />collection utilizing GPS devices, with picture taking capabilities, that would later sync data collected with the GIS application <br />developed for this project. Mr. Rivera conducted staff training on new data collection devices and personally assisted in the <br />calculation of progress utilizing GIS tools build into the GIS application. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT District 4, Broward County Transit Bus Shelter Project, <br />Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL <br />SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />This Design-Build project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton <br />Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Rivera was the CAD Manager on this project responsible <br />for setting up all drawings on this project, including topographic surveys and engineering drawings. This project required the <br />coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter <br />manufacturer and our surveying team. Mr. Rivera also assisted the field crew on this project by helping in the field data <br />collection operation to be able to meet the strict schedule requirements set by the Design-Build Team. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />City-Wide Roadway Topographic Surveys for CIP Projects, City <br />of Opa-Locka, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL <br />SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />This project included the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements <br />as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. Mr. Rivera assisted in field data <br />collection as survey crew member, and later on the drafting of collected data and the production of survey drawings, <br />representing all ROW data, property information, above ground features, manholes and elevations. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Various Roadway Intersections Surveys, Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL <br />SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade <br />County. Mr. Rivera was tasked with collecting field data and drafting the topographic surveys which required the completion <br />of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant <br />topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal <br />drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, as required. <br />76