Laserfiche WebLink
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) <br />Stakeholder Input: Depending on the specific project, it may <br />be desirable to engage and include stakeholder input early on <br />in the process to obtain buy-in from those individuals most <br />impacted by the project. Schematics, aerial images, and <br />renderings allow for input on the plan to meet the needs and <br />requests made by stakeholders. When requested, CGA can <br />also utilize our interactive resident voting devices to obtain <br />quick and effective input from residents. <br />Preparation of Preliminary Deliverables: CGA will prepare <br />preliminary plans and technical memorandums. These <br />documents and specifications may include the following <br />items as needed: <br />• Environmental analysis; <br />• Preliminary site plans; <br />• Preliminary planting plans; <br />• Preliminary building plans; <br />• Preliminary roadway and drainage design plans; <br />• Pedestrian Studies; <br />• Access Management Studies; <br />• Drainage Review; <br />• Geotechnical Investigation; <br />• Preliminary Utility Alignments; <br />• Intersection lane analysis; <br />• Lighting justification report; <br />• Recommended typical cross section(s) for proposed <br />roadway improvements; <br />• Layout of signalization improvements; and <br />• Preliminary structural analysis and plans. <br />These documents and specifications will be submitted to the <br />City for review, comment and approval. <br />Preparation of Plans/Deliverables: CGA will meet with City <br />representatives and receive comments on the preliminary <br />submittals. Following the meeting, our team will prepare a <br />written response to the design comments, make appropriate <br />changes and continue to the 60% and 90% completion level. <br />The 60% and 90% design documents will then be submitted <br />to the City for review, comment and approval. <br />Permitting: After receipt of the City’s input at the 30% <br />drawings, CGA will conduct preliminary meetings with the <br />Agencies Having Jurisdiction (AHJ). After the 60% plans have <br />been reviewed and approved by the City, permit applications <br />will be made to the appropriate agencies. CGA will utilize our <br />long-term relationships with the staff at the AHJs to follow up <br />and expedite all permit approvals. <br />9