Laserfiche WebLink
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 TAMMy COOk-WeeDON <br />TAMMY COOK-WEEDON, PLA, LEED AP+C <br />Calvin, Giordano & Associates, Inc. <br />B.S. Landscape Architecture, 1987 Registered Professional Landscape Architect Florida <br />LeeD AP BD+C <br />Fort Lauderdale, FL <br />Texas A&M University College Station No. 0001328 <br />No. 10066306-AP-BD+C <br />Ms. Cook-Weedon leads the Landscape Architectural staff, has over 33 years of landscape architectural experience with demonstrated <br />strengths in creative design, graphic presentations, and planting design. She has successfully completed numerous large-scale projects, <br />which encompassed design studies, planting designs, natural area development and the various inter-related professions and tasks necessary <br />to manage the projects through to completion. Ms. Cook-Weedon manages a staff of eleven at CGA where she provides scheduling, addresses <br />CAD staffing and directs design issues as well as monitors budgets and serves on the Executive Management team. <br />LANDSCAPE ARCHITECT 33 23 <br />Mills Pond Park: Soccer/Lacrosse Fields <br />Fort Lauderdale, Florida <br />Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil <br />engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of the <br />new fields will include drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements. CGA’s <br />fees: $379,000. Construction cost is estimated at $3.3 million <br />2016 2019 <br />Soccer Field Conversion at Weston Regional Park <br />Weston, Florida <br />Ms. Cook-Weedon managed staff of the landscape architecture department to convert four of the City’s existing grass soccer fields to <br />synthetic turf fields. These conversions will be the first of two park field conversions in the city. The selected synthetic turf option uses an <br />organic infill material rather than the standard black rubber material. Early test results indicated players raving about the playing surface. <br />Services included Civil Engineering as well. Cost: $350,000.00 Construction cost estimated at $3.5 million. <br />2014 - 2016 2018 <br />Middle Beach Recreational Corridor <br />Miami Beach, Florida <br />Landscape Architect of Record – CGA oversaw coordination of all engineering & environmental efforts associated this 2-mile long linear <br />multi-use trail project on State-owned lands, as well as was responsible for all planting & hardscape design & public outreach. CGA <br />designed & permitted an on-grade, ADA-accessible pathway that supports the use of pedestrians & cyclists. The project is a part of <br />the greater Atlantic Greenway Network & comprises a critical component of the bicycle facilities throughout the City. It connects Indian <br />Beach Park on the south to the North Beach Recreational Trail at Allison Park with a 2-mile paver walkway, continuing the City’s unique <br />branding qualities. Conducted one-on-one meetings with over 39 condominium properties to gather support for the project, respond to <br />resident’s concerns, & address design restrictions set forth in the FAC & balance those against resident’s expectations. CGA successfully <br />shepherded the project through all State & local agency permitting processes. Cost: $534,000.00. Const. Cost Estimated at $13.2 M <br />2013 2014 <br />66