Laserfiche WebLink
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 MARcOS MeNDOzA <br />MARCOS MENDOZA <br />calvin, Giordano & Associates, Inc. <br />A.A. IN ARcHITecTURe <br />Fort Lauderdale, FL <br />Miami Dade Community College, Miami, FL <br />Mr. Mendoza directs the landscape architectural staff in all code compliance and site design issues. His expertise lies in the production and <br />development of several residential communities and large-scale commercial projects. He assists in quality control of project documents <br />through developments in standards and systems consultation. He has also had experience in the development of institutional, educational and <br />healthcare projects. Marcos provides the Irrigation Designs for CGA’s projects. <br />IRRIGATION/SITE DESIGN 24 20 <br />Mills Pond Park: Soccer/Lacrosse Feilds <br />Fort Lauderdale, Florida <br />Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil <br />engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of <br />the new fields will include drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements. <br />Construction cost is estimated at $3.3 million. CGA’s fees: $379,000. <br />2014 - 2018 2018 <br />Soccer Field conversion at Weston Regional Park <br />Weston, Florida <br />The City of Weston will be converting two soccer fields to synthetic turf, these conversions will be the first of two park field conversions <br />in the city. The selected synthetic turf option uses an organic infill material rather than the standard black rubber material. These fields <br />will be cooled down with the use of long range rotors specifically designed for synthetic turf cooling & cleaning. Services included Civil <br />Engineering as well. CGA’s fees: $350,000.00. <br />2016 2018 <br />Football Field conversion at cypress Bay High School <br />Weston, Florida <br />Prepared detailed site plans and irrigation plans for the conversion of an existing turf football field park to synthetic turf. The selected turf <br />option is to use an organic fill material rather than the standard black rubber material. This required a cooling system and for cost saving <br />a specialized booster pump with 4 custom ports where created in order to use a self-reeling watering wheel system. Services included <br />Civil Engineering as well. CGA Fees: $100,000. <br />2015 2017 <br />76