My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tierra South Florida, Inc. (TSF)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Tierra South Florida, Inc. (TSF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:29:06 AM
Creation date
8/21/2020 11:27:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />4 <br /> 21. TITLE AND LOCATION (City and State) <br />Wastewater Pump Station Improvements / Hispanola Ave at Mutiny Ave and <br />Galleon St at E Treasure Dr, North Bay Village, Florida <br />22. YEAR COMPLETED PROFESSIONAL SERVICES <br />2019 CONSTRUCTION (If applicable) <br /> 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County c/o Kimley-Horn b. POINT OF CONTACT NAME Ms. Marissa Maring, P.E. c. POINT OF CONTACT TELEPHONE NUMBER / EMAIL (954) 535 5137 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF performed a Geotechnical Engineering Study for the North Bay Village Lift Stations located in North Bay Village, Florida. The project consists of a Lift Stations in the intersection of Hispanola Avenue and Mutiny Avenue and in the intersection of Galleon Street and E Treasure Drive. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundations, wet wall foundations, valve vault foundations, utilities, excavations and dewatering, lateral Earth Pressures, and preconstruction conditions survey. <br />The project was completed on time and within budget in 2019 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME <br />TSF (2) FIRM LOCATION (City and State) <br />West Palm Beach, FL <br />(3) ROLE <br />Geotechnical Engineering Services <br /> <br />50
The URL can be used to link to this page
Your browser does not support the video tag.