My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tierra South Florida, Inc. (TSF)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Tierra South Florida, Inc. (TSF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:29:06 AM
Creation date
8/21/2020 11:27:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br /> 5 <br /> 21. TITLE AND LOCATION (City and State) <br />SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157 Avenue, <br />Miami-Dade County, Florida <br />22. YEAR COMPLETED PROFESSIONAL SERVICES <br />2019 CONSTRUCTION (If applicable) <br /> 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami- Dade Public Works and Waste Management c/o David Plummer & Associates, Inc. <br />b. POINT OF CONTACT NAME Mr. Victor Lee c. POINT OF CONTACT TELEPHONE NUMBER (305)-447-0900 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF provided Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. The study was performed to obtain information on the existing subsurface conditions along the project alignment to assist in the design and preparation of construction plans for improvements. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability. <br />The project was completed on time and within budget in 2019 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME <br />TSF (2) FIRM LOCATION (City and State) <br />West Palm Beach, FL <br />(3) ROLE <br />Geotechnical Engineering Services <br /> <br />51
The URL can be used to link to this page
Your browser does not support the video tag.