My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tierra South Florida, Inc. (TSF)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Tierra South Florida, Inc. (TSF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:29:06 AM
Creation date
8/21/2020 11:27:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br /> 8 <br />21. TITLE AND LOCATION (City and State) <br />N. Miami Avenue Bridge Replacement, <br />Miami-Dade County, Florida <br />22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County c/o Douglas N. Higgins b. POINT OF CONTACT NAME Mr. Bernie Barrile c. POINT OF CONTACT TELEPHONE NUMBER (561) 379-8979 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF provided QC Services for the N. Miami Avenue Bridge Replacement, located in Miami-Dade County, Florida. TSF services included laboratory testing, soil sampling/testing, and reporting. Sampling and Laboratory Testing include modified proctor values on subgrade and base material; LBR tests on subgrade and base materials; CTQP Certified TSF technicians are currently performing in-place density testing on slabs, subgrade and base materials and sample pick-ups. Provided a QC Plan and TSF maintained a Density Logbook on-site. A TSF QC Manager provided review of daily reports, project coordination and attended meetings as necessary. <br />The project was completed on time and within budget in 2019 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME <br />TSF (2) FIRM LOCATION (City and State) <br />West Palm Beach & Miami Lakes, FL <br />(3) ROLE <br />Construction Material Testing Services / QC <br />Services <br />54
The URL can be used to link to this page
Your browser does not support the video tag.