<br />extended due to owner requested expansion to scope of work.
<br />Pro/ect Challenges & Approach: Records drawings for this project are extremely limited. CAS
<br />performed utility locates and coordinated with City O&M staff where necessary to verify locations
<br />of existing water mains, valves and services and designed new water mains in a manner which
<br />minimized water service disruption to customers and reduced restoration impacts to roadways,
<br />driveways and landscaping. In addition, CAS through public informational meetings familiarized
<br />homeowners with the project scope and involved them during the design process by incorporating
<br />design elements such as location of water service lines and meter box location preferences on
<br />their property and addressed any other concerns during the design and construction phase. In
<br />addition, project construction scheduling (phasing) was clearly provided to homeowners well in
<br />advance of construction.
<br />Design Cost: $310,149
<br />Construction Cost: $2,618,649
<br />•Hardee County -Wauchula HIiis Water Main Improvements -Phase VI, Wauchula, Florida
<br />Status: On-going (Construction Phase -60% complete)
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, Greg Giarratana, Keith Schriner, Robert D. Keener
<br />Scope of Work: Survey, design, contract document development, permitting, bidding, construction
<br />management and observation through project close-out for the installation of approximately
<br />1,000 linear feet of 6" water main, 4,000 linear feet of 8" water main, and 4,450 linear feet of 10
<br />water main including roadway/driveway restoration including fire hydrants and valves, and
<br />connections to existing 4" and 12" water mains.
<br />Pro/ect Challenges & Approach: Community outreach and coordination with residents for water
<br />service connections is essential for the successful completion of this project. Also close
<br />coordination with the contractor during construction has been maintained in order to ensure that
<br />driveway and roadway damage/restoration Is minimized.
<br />Design Cost {Including Construction Management): $100,426
<br />Construction Cost: $1,775,635
<br />•Hardee County -Wauchula HIiis Water & Sanitary Sewer Improvements -Phase V, Wauchula,
<br />Florida
<br />Status: On-going (Construction Phase -80% complete)
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, Greg Giarratana, Keith Schriner, Robert D. Keener
<br />Scope of Work: Survey, design, contract document development, permitting, bidding, construction
<br />management and observation through project close-out for the installation of approximately
<br />7,500 linear feet of 8" water main including fire hydrants, one duplex submersible wastewater lift
<br />station, approximately 1,500 linear feet of 6" force main and approximately 5,000 linear feet of
<br />8" gravity sanitary sewer.
<br />Prolect Challenges & Approach: Community outreach and coordination with residents for water
<br />and sewer service connections is essential for the successful completion of this project. Also close
<br />coordination with the contractor during construction has been maintained in order to ensure that
<br />driveway and roadway damage/restoration is minimized.
<br />Design Cost Clncludlng Construction Management): $221,453
<br />Construction Cost: $2,068,956
<br />•City of Margate -2018 Water Main Improvements, Margate, Aorlda
<br />Status: On-going (Construction Phase -50% complete)