Laserfiche WebLink
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />SECTION E1 -QUALIFICATION <br />IN FORMATION AND ASSIGNED <br />PERSONNEL <br />Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony <br />Gomes Scope of Work: Survey, design, utility locates, preparation of construction plans and contract <br />documents, permitting, bidding assistance, construction management and limited construction <br />observation through project closeout/start-up services for the replacement of 2-inch galvanized <br />steel water mains with 6-inch DIP at fifteen (15) different locations throughout the City including a <br />total water main replacement of approximately 12,000 linear feet, GPR scanning, locates, test <br />hole investigations, water service replacements, asbestos concrete pipe removal, fire hydrant <br />replacement, fire hydrant spacing analysis and a valve shutdown plan. <br />Pro/ect Challenges & Approach: The project area is discontinuous and the water main <br />replacements are being made in a corridor that Is very congested with burled utilities. <br />Comprehensive sub surface utility engineering was essential to determine a feasible new water <br />main alignment. The project is being constructed in phases in order to minimize restoration <br />Impacts at any given time. CAS is also coordinating closely with City staff to address any resident <br />concerns or complaints during construction. <br />Design Cost: $212,280 <br />Construction Cost: $1,407,821 <br />•Spring Lake Improvement District -Force Main & Water Main Installation Project to provide <br />service to the New Wastewater Treatment Plant, Sebring, Florida. <br />Status: Completed 201.9 <br />Prime Consultant: CAS <br />Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, <br />Michael JonesScope of Work: Survey, design, preparation of construction plans, contract documents, permitting, <br />bidding, construction management and SRF funding assistance and administration through <br />project closeout/start-up services for the construction of 9,505 linear feet of 8"-1.0" force main <br />and water main to the New Wastewater Treatment Plant site. The project was 100% SRF funded. <br />This project was completed on time and within budget. <br />Design Cost {Including Construction Management: $125,500 <br />Construction Cost: $750,000 <br />•City of Belle Glade -Torry Island Sanitary Sewer Extension, Belle Glade, Florida <br />Status: Completed 2019 <br />Prime Consultant: CAS <br />Key CAS Staff: James Orth, Al Caruso, Robert Keener, James F. Driscoll, Willian Tanto, Michael <br />JonesScope of Work: Survey, design, preparation of construction plans and contract documents, <br />permitting, bidding, construction management through project closeout for the extension of the <br />existing gravity sanitary sewer system at the Torry Island Campground and Marina. More <br />specifically the project included expansion of the existing gravity sewer collection system with 1.31. <br />sewer lateral connections to select campsites along Kentucky, Florida, Georgia, Main Street and <br />Liars Island. Design included installation of a private duplex lift station, 1.52 linear feet of 2" PVC <br />sewer force main, 1,546 linear feet of 8" gravity sanitary sewer with 8 associated manholes. <br />Additional improvements included electrical service upgrades and hose bib installations at each <br />campsite. This project was completed on time and within budget. <br />Design Cost: $1.83,200 <br />Construction Cost: $1.,639,631 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110