Laserfiche WebLink
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />30 Subsurface Imaging • Utility Coordination <br />SECTION E1 -QUALIFICATION <br />INFORMATION AND ASSIGNED <br />PERSONNEL <br />•Hardee County - Wauchula HIiis Water & Sanitary Sewer Improvements -Phase IV, Wauchula, <br />Florida <br />Status: Completed 2017 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, Greg Giarratana, Keith Schriner, Robert D. KeenerScope of Work: Survey, design, contract document development, permitting, bidding, construction <br />management and observation through project clos�ut for the installation of approximately <br />6,125 linear feet of 8" water main and 5,277 linear feet of 8" gravity sanitary sewer including <br />connection to 51 private residences and the decommissioning of septic tanks. This project was <br />completed on time and within budget. <br />Pro/ect Challenges & Approach: Community outreach and coordin ation with residents for water <br />and sewer service connections was essential for the successful completion of this project. Also <br />close coordination with the contractor during construction was necessary in order to ensure that <br />road damage/restoration was minimized. <br />Design Cost Clncludlng Construction Management}: $189,628 <br />Construction Cost: $1,249,013 <br />•City-County Publlc Works Authority (CCPWA} -Avenue R Wastewater Collectlon/Conveyance <br />System Improvements, Moore Haven, Florida <br />Status: Completed 2017 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, Keith Schriner, Greg Giarratana, Robert KeenerScope of Work: Survey, design, preparation of construction plans and contract document <br />development, permitting, bidding, construction management, const ruction observation through <br />project closeout/start-up services for the installation 1,200 linear feet of 8-inch FM replacement, <br />one (1) 180-linear foot directional drill, seven (7) sanitary sewer manhole structures, 2,800 linear <br />feet of gravity sewer, thirty-two (32) service laterals, fifty-two (52) clean-outs for residential hook­ <br />ups, roadway reconstruction. This project is a continuation of an existing system and part of a <br />gravity sewer collection master plan which addresses infrastructure needs within the southeastern <br />residential area of the City. This project was completed on time and within budget. <br />Design Cost {Including Construction Management}: $47,280 <br />Construction Cost: $426,787 <br />•Mlccosukee Tribe of Aorlda -Water Distribution System Improvements, Miami Dade, Aorida <br />Status: Completed 2015 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, Greg Giarratana, Robert KeenerScope of Work: Survey, design, permitting, contract development, bidding services and construction <br />oversight for the installation of 15,000 LF of 12" water main which included eight (8) 12• diameter <br />horizontal dlrectlonal drllllng installations, one (1) s• horizontal dlrectlonal drill and new water service <br />lines to residences. This project was completed on time and within budget. <br />Design Cost: (Including Construction Management} $516,000 <br />Construction Cost: $2,580,000 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110