Laserfiche WebLink
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />30 Subsurface Imaging • Utility Coordination <br />SECTION E1 -QUALIFICATION <br />INFORMATION AND ASSIGNED <br />PERSONNEL <br />because record drawings for the project area are outdated and Incomplete. In addition, existing <br />soil conditions are not conducive to the use of GPR or other radar scanning equipment for locating <br />buried utilities. <br />Design Cost: $62,239 <br />Construction Cost: TBD <br />•City of Margate -East WWTP Triplex Uft Station Reha bilitation, Margate, Florida <br />Status: On-Hold as per Owner/Client's Request (Design Complete) <br />Prime Consultant: CAS <br />Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony <br />GomesScope of Work: Survey, design, preparation of construction plans and contract documents, <br />permitting, bidding, construction management and limited construction observation through <br />project closeout/start-up services for the removal and replacement of the station's existing <br />pumps, checks, valves and control panel. Design was completed on time and within budget. <br />Pro/ect Challenges & Approach: The project scope entails retrofitting of the existing pump station. <br />Close coordination with the cit y's plant operator will be essential during the design process, <br />because record drawings for the project area are outdated and incomplete. In addition, existing <br />soil conditions are not conducive to the use of GPR or other radar scanning equipment for locating <br />buried utilities. <br />Design Cost: $53,619 <br />Construction Cost: $ TBD <br />•City of Margate -Uft Station No.21 Rehabilitation, Margate, Florida <br />Status: Completed 2020 <br />Prime Consultant: CAS <br />Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony <br />GomesScope of Work: Survey, design, preparation of construction plans and contract documents, <br />permitting, bidding, construction management and limited construction observation through <br />project closeout/start-up services for the decommissioning the lift station's existing dry pit and <br />retrofitting the existing wet pit into a duplex submersible lift station with above ground valves and <br />piping; including the installation of a retaining wall, relining existing structures, FOOT MOT, new <br />water service line and backflow preventer, fencing, and upgrading the electrical equipment <br />incl uding control panel and SCADA system. <br />Pro/ect Challenges & Approach: This project consisted of a lift conversion from a wet pit/dry pit to <br />a submersible type station within a limited easement area and low overhead powerlines. <br />Therefore, the design was modified to include above-grade piping, valves and fittings and the re­ <br />use of the existing wetwe/1. <br />Design Cost: $60,990 <br />Construction Cost: $ 298,216 <br />•Spring Lake Improvement District - Wastewater Treatment Plant Duplex Sanitary Sewer Lift <br />Station, Sebring, Florida <br />Status: Completed 2019 <br />Prime Consultant: CAS <br />Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, <br />Michael JonesScope of Work: Survey, design, preparation of construction plans, contract documents, permitting, <br />bidding, construction management and SRF funding assistance and administration through <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.cralgasmith.com • LB3110