<br />because record drawings for the project area are outdated and Incomplete. In addition, existing
<br />soil conditions are not conducive to the use of GPR or other radar scanning equipment for locating
<br />buried utilities.
<br />Design Cost: $62,239
<br />Construction Cost: TBD
<br />•City of Margate -East WWTP Triplex Uft Station Reha bilitation, Margate, Florida
<br />Status: On-Hold as per Owner/Client's Request (Design Complete)
<br />Prime Consultant: CAS
<br />Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony
<br />GomesScope of Work: Survey, design, preparation of construction plans and contract documents,
<br />permitting, bidding, construction management and limited construction observation through
<br />project closeout/start-up services for the removal and replacement of the station's existing
<br />pumps, checks, valves and control panel. Design was completed on time and within budget.
<br />Pro/ect Challenges & Approach: The project scope entails retrofitting of the existing pump station.
<br />Close coordination with the cit y's plant operator will be essential during the design process,
<br />because record drawings for the project area are outdated and incomplete. In addition, existing
<br />soil conditions are not conducive to the use of GPR or other radar scanning equipment for locating
<br />buried utilities.
<br />Design Cost: $53,619
<br />Construction Cost: $ TBD
<br />•City of Margate -Uft Station No.21 Rehabilitation, Margate, Florida
<br />Status: Completed 2020
<br />Prime Consultant: CAS
<br />Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony
<br />GomesScope of Work: Survey, design, preparation of construction plans and contract documents,
<br />permitting, bidding, construction management and limited construction observation through
<br />project closeout/start-up services for the decommissioning the lift station's existing dry pit and
<br />retrofitting the existing wet pit into a duplex submersible lift station with above ground valves and
<br />piping; including the installation of a retaining wall, relining existing structures, FOOT MOT, new
<br />water service line and backflow preventer, fencing, and upgrading the electrical equipment
<br />incl uding control panel and SCADA system.
<br />Pro/ect Challenges & Approach: This project consisted of a lift conversion from a wet pit/dry pit to
<br />a submersible type station within a limited easement area and low overhead powerlines.
<br />Therefore, the design was modified to include above-grade piping, valves and fittings and the re
<br />use of the existing wetwe/1.
<br />Design Cost: $60,990
<br />Construction Cost: $ 298,216
<br />•Spring Lake Improvement District - Wastewater Treatment Plant Duplex Sanitary Sewer Lift
<br />Station, Sebring, Florida
<br />Status: Completed 2019
<br />Prime Consultant: CAS
<br />Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll,
<br />Michael JonesScope of Work: Survey, design, preparation of construction plans, contract documents, permitting,
<br />bidding, construction management and SRF funding assistance and administration through
<br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.cralgasmith.com • LB3110
|