My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />SECTION E1 -QUALIFICATION <br />INFORMATION AND ASSIGNED <br />PERSONNEL <br />project closeout/start-up services for the construction of a new 15 HP duplex submersible lift <br />station rated at 510GPM @ 67 TOH with SCADA system and backup power generator to service <br />the new Wastewater Treatment Plant. The project was 100% SRF funded. This project was <br />completed on time and within budget. <br />Design Cost: $60,000 <br />Construction Cost: $250,000 <br />•City of Margate -Uft Station No.22 Rehabllltatlon, Margate, RorldaStatus: Completed 2017 <br />Prime Consultant: CAS <br />Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony <br />Gomes <br />Scope of Work: Survey, design, preparation of construction plans and contract documents, <br />permitting, bidding, construction management and limited construction observation through <br />project closeout/start-up services for the decommissioning the existing wet pit/dry pit lift station <br />and converting to a duplex submersible station along with installation a new wet well and valve <br />vault. In addition, the installation of all stainless steel piping inside the proposed wet well, relining <br />existing structures, manholes, gravity sewer, fencing, upgrading the electrical equipment, control <br />panel and installation of a SCADA system.Design Cost: $18,488 <br />Construction Cost: $571,667 <br />•Bal Harbour VIiiage -Wastewater Pump Station No. 3 and Gravity Sewer Improvements, Bal <br />Harbour, Florida <br />Status: Completed 2017Prime Consultant: CAS <br />Key CAS Staff: Stephen C. Smith, William H. Landis, Greg Giarratana, Al Caruso, James F. Driscoll, <br />Robert Keener, William Tanto <br />Scope of Work: Survey, utility locates, design, permitting, preparation of construction plans, cost <br />estimates, contract documents, assistance during bidding, construction management and <br />certification through project close-out for the installation of a new triplex submersible pump <br />station with a 12-foot diameter wetwell with electrical controls building and approximately 1,350 <br />linear feet of 18" gravity sanitary sewer. This project was partlally grant funded and was <br />completed on time and within budget.Design Cost: $147,860Construction Cost: $1.985,000 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
The URL can be used to link to this page
Your browser does not support the video tag.