Laserfiche WebLink
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />SECTION E1 -QUALIFICATION <br />INFO RMATION AND ASSIGNED <br />PERSONNEL. <br />SURVEYING & UTILITY LOCATING PROJEClS <br />tr <br />•City of Delray Beach -Lowson Boulevard Roadway & Drainage Improvements, Delray Beach, <br />Florida <br />Status: Completed 2019 <br />Prime Consultant: Kimley-Horn & Associates, Inc. <br />Subconsultant: CAS <br />Key CAS Staff: Stephen C. Smith, James F. Driscoll, David Lookabill, Robert KeenerScope of Work: Survey of all above ground visible improvements and utilities within the right-of­ <br />way of Lowson Boulevard (SW 10th Street) and 10 feet beyond the right-of-way line from the east <br />right-of-way of Congress Avenue to the intersection of SE 6th Avenue. In addition, rims, pipe invert <br />elevations, sizes and pipe materials were acquired for all existing drainage structures within the <br />project limits. Subsurface utility engineering included soft digs at fifty (50) designated locations to <br />verify depths, sizes and materials of conflicting buried utilities. This project was completed on time <br />and within budget. <br />Project Cost: $58,550 <br />•City of West Palm Beach -East Central Regional Water Reclamation Faclllty Record Drawing <br />Updates, West Palm Beach, Florida <br />Status: Completed 2019 <br />Prime Consultant: Hazen & Sawyer, Inc. <br />Subconsultant: CAS <br />Key CAS Staff: Stephen C. Smith, James F. Driscoll, Robert Keener, David Lookabill, Donald DrakeScope of Work: Surveyed to establish horizontal control, benchmarks and locating all pertinent <br />above ground visible improvements and utilities within the project area. Utility surface designation <br />and mapping was performed utilizing 2D Ground Penetrating Radar, 3D Radar Tomography <br />scanning and calibration soft digs for approximately 260,000 ft2 of the facility to identify types, <br />sizes and locations of buried utilities. Deliverables included full electronic files containing CAD, <br />survey data and imagery collected and scanning performed for this project. All files were <br />compatible with the Civil 3D CADD platform. This project was completed on time and within <br />budget. <br />Project Cost: $36,330 <br />•Seacoast Utility Authority -Northlake Boulevard Water & Force Main Replacement Project - <br />Phase �II, Palm Beach Gardens, Florida <br />Status: Completed 2018 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110