My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12.NAME 13.ROLE IN THIS CONTRACT <br />Project Engineer -Water & Sewer <br />14.YEARS EXPERIENCE <br />Greg Giarratana a.TOTAL b.WITH CURRENT <br />FIRM <br />43 22 <br />15.FIRM NAME AND LOCATION (City and State) <br />Craig A Smith and Associates, Inc. <br />Boca Raton, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION)17.CURRENTLY PROFESSIONAL <br />REGISTRATION (STATE AND DISCIPLINE)B.S. Civil/Environmental Engineering, 1977, Rogers Williams <br />University, Bristol, Rhode Island <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) <br />ASCE, WPCF and AWWA <br />a. <br />b. <br />19.RELEVANT PROJECTS <br />(1)TITLE AND LOCATION (City and State)2 YEAR COMPLETED <br />Wauchula Hills Water and Sanitary Sewer Improvement PROFESSIONAL CONSTRUCTION (if <br />Project -Phase VI SERVICES a licable Wauchula, Florida 2017 <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect erformed with current firm <br />Project manager: Professional engineering services for the installation of approximately 1,325 linear feet of 6" water <br />main, 6,460 linear feet of 8" water main, and 4,862 linear feet of 1 O" water main including roadway/driveway <br />restoration including fire hydrants and valves, and connections to existing 4" and 12" water mains. This project is <br />funded through a multi-year special legislative appropriation. The project design cost, including construction <br />management is $100,426. The project construction cost is $1,826,130. <br />(1)TITLE AND LOCATION (City and State) <br />Spring Lake Improvement District <br />US Highway 98 / Country Road 700 Wastewater Force Main <br />System Expansion <br />Sebrin , Florida <br />2 YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION (if <br />SERVICES a licable <br />2019 Pending <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm <br />Project Manager: Design, survey, utility locates, geotechnical investigation, grant funding, permitting and <br />construction for the installation of approximately 12,400 linear feet of wastewater forcemain along US Highway <br />98/County Road 700 to expand the district's new wastewater treatment plant service area for commercial <br />development along the corridor. This project is 100% grant funded (legislative appropriation). Design cost <br />including construction management is $184,777. Estimated construction cost is $9 12,000.
The URL can be used to link to this page
Your browser does not support the video tag.