Laserfiche WebLink
<br /> <br />reworkings of the project. Improvements <br />encompassed the reconstruction or <br />milling and resurfacing of existing <br />pavements, upgrading drainage <br />systems, new signing and pavement <br />markings, replacing broken sidewalks, <br />ADA ramps, and adding root barriers at <br />existing tree locations. Different phases <br />of the project were all executed by Mr. <br />Fontaneau and required geotechnical <br />reports, topographical surveying, <br />preliminary design layouts of roadway <br />planning, alongside improvements of <br />roadways, curbs and gutters, sidewalks, <br />driveways, handicap ramps, and <br />roadway markings and signage. Typical <br />roadway cross sections were also prepared, and the Master Plan was used to aid in <br />modifying any other essential improvements. <br /> <br />◼ Design Senior Project Manager for the engineering design, preparation of construction <br />documents, permitting and processing, along with providing bid and construction phase <br />support services to the Town of Medley for the construction of a roadway improvement <br />project along NW 91st Street from NW 87th Avenue to approximately 700’ west of existing <br />roadway in front of the Waste Management Property. Work incorporated the preparation of <br />engineer’s estimate of probable construction cost, the preliminary design plans, contracting <br />and coordinating with the Surveyor and geotechnical test lab to obtain information required <br />for the preliminary design and any other engineering related duties that may have presented <br />themselves. <br /> <br />◼ Mr. Fontaneau has been working as the Senior Project Manager for Coral Keys Homes <br />located in Florida City, off SW 336th Street and SW 172nd Avenue. The tasks associated <br />with this project have been the revision of the site plan’s Stormwater Management Systems <br />to meet RER and SFEMD requirements, in conjunction with managing the design <br />adjustments of site elevations, fire hydrant locations, grading, parking spaces and a <br />landscape island. Furthermore, designing the water and sewer lines of the new building, <br />together with adding the new drainage systems between and at the rear of all the buildings. <br /> <br />◼ Mr. Fontaneau functioned as the Senior <br />Project Manager for NW 7th Street Road <br />Improvement, which included the Seawall <br />Design of Outlet and Surrounding Structure <br />for the City of Miami Drainage Project. The <br />design of the project consisted of the <br />surveying of the right of way area, <br />repositioning of curbs, increasing swale <br />areas and gutters, regrading gutter line to <br />account for significant tidal intrusion, <br />reconstruction of sidewalk, and addition of <br />manhole to pre-existing pipe. <br /> <br />14