My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:58:16 AM
Creation date
8/21/2020 11:57:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />9 <br />21. TITLE AND LOCATION (City and State) <br />City of Coral Gables Ponce de Leon CEI (LAP Project) <br />Coral Gables, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2012 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />City of Coral Gables <br />b. POINT OF CONTACT NAME <br />Ernesto Pino <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305-460-5004 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Construction administration support and inspection services during <br />the construction of Ponce de Leon Boulevard Median Beautification <br />project as required by the Department to meet FDOT’s LAP Program <br />requirements. Scope of work consist of, but not limited to, the <br />following: <br /> <br />• Provided CEI and construction administration services as required <br />for the LAP Program. <br />• Attended pre-construction meeting and prepared minutes for <br />distribution. <br />• Reviewed shop drawings submitted by Contractor for adherence <br />to construction documents. <br />• Attended bi-weekly progress meetings and prepared the minutes <br />for distribution. <br />• Responded to Contractor request for information and <br />clarification of contract documents. <br />• Coordinated utility issues/conflicts. <br />• Processed all construction correspondence and documents. <br />• Reviewed and recommended Contractor payment requisitions. <br />• Reviewed Contractor’s certified payrolls. <br />• Conducted labor interviews to ensure wage rate compliance. <br />• Verified Contractor’s Disadvantaged Business Enterprise (DBE) <br />on-going training program. <br />• Reviewed Contractor EEO requirements. <br />• Provided on the Job Training (OJT) monitoring and reporting. <br />• Reviewed and recommend Contractor change order requests, if any. <br />• Provided full-time inspector (40 hours per week). <br />• Conducted semi-final inspection and prepared punch list. <br />• Conducted final inspection, punch list, and contract close-out. <br />• QA/QC – limited materials and density testing provide independent <br />assurance testing and coordinate with testing lab to obtain sampling and <br />testing. Compared test results and document in project records. <br />• Provided photo history of project in digital format. <br />• Other construction phase engineering services as requested by the <br />Department. Professional Fess: $342,765 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />SRS Engineering, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br />(3) ROLE <br />Prime <br />b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />45
The URL can be used to link to this page
Your browser does not support the video tag.