Laserfiche WebLink
<br /> <br /> <br />Jeovanny Rodriguez, PE <br /> <br />City of Miami- NW South River Drive (Segment D) from NW 5th Street to SW 3rd Street Director <br />supervising a total reconstruction of an existing a two- lane roadway design and planning. Roadway <br />features involved pavement, subsurface elements, pavement markings, street lighting, and <br />relocation of FPL power distributions and poles. Along with a drainage system of French drains and <br />solid interconnected pipes, plus two out falls to the Miami River and construction of the Miami River <br />walk adjacent to the roadway. <br /> <br />City of Miami- NW North River Drive (Spring Gardens) from NW 7th Avenue to NW 12th Avenue <br />Director organizing a total reconstruction of an existing a two- lane roadway design and planning. <br />Design involved drainage system containing French drains, solid interconnected pipes and two out <br />falls into the Miami River, pavement, subsurface elements, pavement markings, relocation of FPL <br />power distributions and poles. Other designs were needed for new street lighting and the <br />construction of Miami River walk adjacent to the roadway. <br /> <br />City of Miami- Mary Brickell Drainage Improvements Director handling improvements of several <br />roads. Design and planning for improvements for SW 9th Street, SW 10th Street, SW 11th Street, SW <br />12th Street between NW 1st Court and Miami Avenue. The total reconstruction of the existing two- <br />lane roads involved the drainage system containing French Drains, Solid interconnected pipes and <br />new storm water pump station at SW 8th Street and SW 1st Court, each pump station requiring three <br />deep injection wells and overflow connection to Miami River. Other aspects of the design included <br />pavement, subsurface elements, pavement markings, and new street lighting. <br /> <br />City of Miami- San Marco Drainage Improvements Director liable for the design and planning of <br />improvements to several roads in the Island of San Marco. Reconstruction of existing two-lane <br />roads. Highlights encompassed pavement, subsurface elements, pavement markings, street lighting <br />and the new drainage system composed of French drains, solid interconnected pipes and a new <br />storm water pump station at the east side of island. Pump station incorporates three deep injection <br />wells and overflow connection to Biscayne Bay. <br /> <br />Project experience all occurred at prior employments. <br />71