My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:58:16 AM
Creation date
8/21/2020 11:57:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Jeovanny Rodriguez, PE <br /> <br />City of Miami- NW South River Drive (Segment D) from NW 5th Street to SW 3rd Street Director <br />supervising a total reconstruction of an existing a two- lane roadway design and planning. Roadway <br />features involved pavement, subsurface elements, pavement markings, street lighting, and <br />relocation of FPL power distributions and poles. Along with a drainage system of French drains and <br />solid interconnected pipes, plus two out falls to the Miami River and construction of the Miami River <br />walk adjacent to the roadway. <br /> <br />City of Miami- NW North River Drive (Spring Gardens) from NW 7th Avenue to NW 12th Avenue <br />Director organizing a total reconstruction of an existing a two- lane roadway design and planning. <br />Design involved drainage system containing French drains, solid interconnected pipes and two out <br />falls into the Miami River, pavement, subsurface elements, pavement markings, relocation of FPL <br />power distributions and poles. Other designs were needed for new street lighting and the <br />construction of Miami River walk adjacent to the roadway. <br /> <br />City of Miami- Mary Brickell Drainage Improvements Director handling improvements of several <br />roads. Design and planning for improvements for SW 9th Street, SW 10th Street, SW 11th Street, SW <br />12th Street between NW 1st Court and Miami Avenue. The total reconstruction of the existing two- <br />lane roads involved the drainage system containing French Drains, Solid interconnected pipes and <br />new storm water pump station at SW 8th Street and SW 1st Court, each pump station requiring three <br />deep injection wells and overflow connection to Miami River. Other aspects of the design included <br />pavement, subsurface elements, pavement markings, and new street lighting. <br /> <br />City of Miami- San Marco Drainage Improvements Director liable for the design and planning of <br />improvements to several roads in the Island of San Marco. Reconstruction of existing two-lane <br />roads. Highlights encompassed pavement, subsurface elements, pavement markings, street lighting <br />and the new drainage system composed of French drains, solid interconnected pipes and a new <br />storm water pump station at the east side of island. Pump station incorporates three deep injection <br />wells and overflow connection to Biscayne Bay. <br /> <br />Project experience all occurred at prior employments. <br />71
The URL can be used to link to this page
Your browser does not support the video tag.