My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:58:16 AM
Creation date
8/21/2020 11:57:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Marilys Falcon <br /> <br />City of Miami- MDWASD Pump Stations Upgrades Project Engineer for the engineering <br />design and formulation of construction documents of upgrades to existing Pump Stations. <br />Improvements included pumping units, wet wells, electrical control panels, electrical services, <br />telemetry systems, valve vaults and fittings, replacement of PS piping, demolition of existing <br />pump stations and associated site improvements. In addition to processing and permitting, she <br />partook in the bid phase services. Pump Station Nos. 7, 64, 140, 427, 430, 436, 502, 767, 1018, <br />S-2 and D2-A-2. <br /> <br />Miami-Dade, Florida- Fire Stations Project Engineer responsible for various projects that have <br />included design plans for water systems, storm drainage systems, sanitary sewer systems, and <br />permitting, as well as additional tasks mentioned below. <br /> <br />• Dolphin Fire Station No. 68- Some earthwork <br />• Doral North Fire Station No. 69- DERM, SFWM, MDFRD <br />• Homestead Fire Station No. 16- Geotechnical investigations, paving and draining. <br />• Model City Fire Station No. 2- Project updates, DERM, FDOT and flow test. <br />• Sunny Isles Fire Station No. 10- Geotechnical investigations, flow test and SFWMD. <br /> <br />Miami-Dade, Florida- Shopping Centers Project Engineer running the schematics for the plans <br />of the water, fire and sewer, the grading and drainage, site geometry, on-site paving, and <br />permitting. <br /> <br />• Promenade at Silver Palms <br />• Eureka Promenade <br />• Lakes on the Green <br />• Altos Plaza <br /> <br />Miami-Dade, Florida- Commercial Properties Project Engineer that formulated design details <br />for the sewer and drainage, sidewalk specifications, geotechnical and further details described <br />below. <br /> <br />• Doral Palms Business Park- Drainage, stage-storage calculations and determine storage <br />capacity. <br />• Dr. Pepper Snapple Group- Design plans for warehouse expansion and renovation. <br />• Commerce Bank in Doral <br />• Commerce Bank in Palm Springs <br />• W. 78th Street Warehouse <br />• 5055 Warehouses <br />• 6-Story Building <br /> <br />City of Hialeah- Master Plan Water and Sewer Transmission Lines in Annex Area Project <br />Engineer for the master planning and engineering design of all water and sewer infrastructure <br />required to serve the newly annexed area. This project included the preparation of a water and <br />sewer master plan in coordination with the City of Hialeah Department of Water and Sewers and <br />Miami-Dade WASD. Production of construction documents, specifications and permitting for the <br />water and sewer transmission mains that serve the annexed area: approximately 1,480 LF of <br />24-inch gravity sanitary sewer mains, 10,724 LF of 24-inch force main extensions, 3,229 LF of <br />36-inch force main extensions, and 12,166 LF of 36-inch water main extensions. <br />75
The URL can be used to link to this page
Your browser does not support the video tag.