Laserfiche WebLink
67 <br />ResumesNova Consulting, Inc. <br /> <br /> <br /> <br />Rachel Ferradaz, PE <br />Project Controls Engineer / Scheduler <br /> <br />Ms. Ferradaz has over 20 years of experience in the fields of civil engineering and <br />construction management for municipal and industrial infrastructure projects. Most <br />recently, she has provided project controls on various civil/municipal construction projects. <br />She has been responsible for critical path scheduling, time impact/delay analysis, <br />budgeting and forecasting costs/schedules, reviewing change orders and negotiations, <br />cost estimating, work quality/progress monitoring, and claims mitigation. Additionally, her <br />past project design experience has included wastewater treatment plants, water facilities, <br />pumping stations, transit, and utility infrastructures. <br /> Relevant Experience Pump Station Improvement Program (PSIP), Miami-Dade Water & Sewer <br />Department, FL. Under the terms of a consent decree, Miami-Dade is rehabilitating its <br />wastewater treatment plants and sewer collection and transmission system. Nova was <br />selected to administer and manage the implementation of the PSIP to ensure timely repair <br />of upgrades. Ms. Ferradaz served as the initial Program Controls Lead involved in the <br />sequencing and scheduling an effective implementation of the design and construction <br />components of the program. <br /> Design/Build Miami Dade College Hialeah Garage, Miami Dade College District <br />Board of Trustees of, FL. The project consisted of the design/build of a new parking <br />garage facility on Miami Dade College Hialeah Campus. Nova’s tasks included site and <br />civil design for the facility, as-built information for existing utilities, designing connections <br />to portable water and sanitary sewer service, as well as drainage, paving and grading <br />design for the parking garage and associated facilities. As Assistant Project Manager, Ms. <br />Ferradaz was responsible for engineering design, project management, and permitting. <br /> C-44 System Discharge & Stormwater Treatment Areas, South Florida Water <br />Management District, FL. The C-44 Reservoir/STA project is a component of the Indian <br />River Lagoon-South (IRL-South) Project under the Comprehensive Everglades <br />Restoration Plan. The C-44 project consists of a reservoir and stormwater treatment areas <br />(STAs) located on an approximately 12,000 acre site. Ms. Ferradaz was Project Controls. <br /> <br />60-Inch Force Main Installation under Norris Cut Channel, Miami-Dade Water & <br />Sewer Department, FL. This project involves the replacement of a 54-inch force main <br />with a 60-inch force main, in preparation of the Federal Navigational Dredging Project; the <br />force main was successfully installed via a 72-inch diameter micro-tunnel. <br />Government Cut Channel Utility Relocation Projects, Miami-Dade Water & Sewer <br />Department, FL. This Design/Build project involved two pipeline relocations, a 54-inch <br />wastewater force main installed under Government Cut channel via micro-tunnel <br />trenchless technology, and a 20-inch water main underneath Fisherman’s Channel. As <br />part of the Construction Management/Inspection Team, Ms. Ferradaz was responsible for <br />scheduling, cost estimating, contract compliance review, and <br />development/implementation of the document control plan for the construction team. <br />Education <br />BS, Civil Engineering, Florida State <br />University, 2000 <br /> Credentials | Registrations <br />Licensed Professional Engineer, FL <br />(74686), NY (102066) <br />Lorman Certifications for <br />Construction Delay Claims <br />FIU Certification for Construction <br />Claims <br />Sanitary Sewer System <br />Collection, Transmissions & <br />Treatment Capacity – MDWASD <br />Certification <br />Condition Assessment/Remaining <br />Service Life of Water Distribution <br />Mains – AWWA FL Continuing <br />Education <br />E-builder Advanced Cost <br />Management Training (in progress) <br /> Applications <br />Primavera P3, P6 <br />Microsoft Project <br />Asta Powerproject <br />E-builder <br /> Professional Organizations <br />American Society of Civil Engineers <br />Expertise <br />Civil Engineering <br />Water and Wastewater Resources <br />Project Management <br />Construction Management <br />Project Controls <br />Scheduling <br />Cost Estimating <br />Claims Analysis Management <br /> Experience <br />Nova Consulting – 15 years <br />Bechtel – 5 years <br /> <br /> <br /> <br /> <br /> <br />