Laserfiche WebLink
68 <br /> <br />Rachel Ferradaz, PE │ Project Controls Engineer / Scheduler <br />2 <br /> <br /> <br />South Miami Heights Water Treatment Plant Design of Upper Floridian/Biscayne Aquifer, Miami-Dade Water & Sewer <br />Department, FL. The South Miami Heights Water Treatment Plant was developed as a reverse osmosis treatment facility to provide <br />20 MGD of drinking water, utilizing raw water extracted from the Biscayne Aquifer. The project objective is to revamp the plant process <br />to use ware extracted from the Upper Floridian Aquifer as the raw water source. Ms. Ferradaz serves as Project Manager on Nova’s <br />assistance with the Design Criteria Package. <br /> Central District Wastewater Treatment Plant Headwork Facilities Upgrades, Miami Dade Water & Sewer Department. This <br />project consisted of upgrades to the headwork facilities at the plant’s process treatment streams. Nova was responsible for the process <br />mechanical design criteria, permitting coordination, and the Basis of Design Report; consisting of conceptual drawings through BIM. <br />Ms. Ferradaz served as Sr. Principal Engineer. South District Wastewater Treatment Plant Digester Facility Rehabilitation, Miami-Dade Water & Sewer Department, FL. This <br />project consists of the rehabilitation to the plant’s gas phase digesters. Nova is responsible for the design of the digesters’ recirculation <br />pumps, heat exchangers, transfer pumps, blowers, floating covers, and associated piping and appurtenances. Ms. Ferradaz serves as <br />Sr. Principal Engineer. Central District Wastewater Treatment Plant Master Pump Station 2 Upgrades, Miami-Dade Water & Sewer Department, FL. <br />This Miami-Dade Water & Sewer Department project consists of design services for the Master Pump Station 2 (MPS2) upgrades, <br />which will maintain pump during periods of high flow at the Central District Wastewater Treatment Plant. Nova is responsible for the <br />detailed design of the mechanical, structural and general design drawings, technical specifications, and construction documents. Ms. <br />Ferradaz served as Project Manager. <br /> <br />Central District Wastewater Treatment Plant Injection Well Pump Station Design, Miami-Dade Water & Sewer Department, FL. <br />The project entails the design and permitting of a new injection well pump station. Under a previous task order Nova was responsible <br />for the process mechanical, preliminary design drawings, and regulatory requirements included in the BODR. Currently, Nova is <br />completing the detailed design and development of final design documents for bidding. Ms. Ferradaz serves as Sr. Principal Engineer. <br /> <br />Central District Wastewater Treatment Plant Return Activated Sludge (RAS) Pump Station Improvements, Miami-Dade Water <br />& Sewer Department, FL. The project entailed the rehabilitation and repair of the RAS pump station at the Central District Wastewater <br />Treatment Plant. Nova participated in the mechanical and HVAC detailed design drawings and specifications, project management <br />and coordination, and quality control. Ms. Ferradaz serves as Sr. Principal Engineer. <br /> <br />South Miami Heights Water Treatment Plant, Miami-Dade Water & Sewer Department, FL. The proposed water treatment plant <br />design included membrane buildings, reservoirs, a multi-purpose building raw water booster pumps, strainers, bulk chemical storage, <br />sodium hypochlorite, electrical generator switch building, and a high service pumping station. As Cost Estimator, Ms. Ferradaz worked <br />on updating the cost estimate for the planned activities. <br /> Pipeline Design from South District Wastewater Treatment Plant to the South District Water Reclamation Plant, Miami-Dade Water & Sewer Department, FL. This project included the large diameter piping design as part of the influent pipeline design from the <br />South District Wastewater Treatment Plan to the Water Reclamation Plant, including a canal crossing through micro-tunnel, together <br />with driving and receiving pits. As Assistant Project Manager, Ms. Ferradaz was responsible for design, utility coordination, and cost <br />estimating. South District Wastewater Treatment Water Reclamation Plant, Reclaimed Water Conveyance System, Miami-Dade Water & Sewer Department, FL. The proposed 9.5 mile, 42” conveyance system was envisioned to run from the South District Wastewater <br />Treatment Water Reclamation Plant to a groundwater recharge facility located near the Metro Zoo area. Scope of services included <br />preliminary hydraulic analysis, identification of all necessary permits and potential environmental impacts. Nova provided the <br />ResumesNova Consulting, Inc.