Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Christie Hurley Permitting & <br />Benthic Surveys <br /> a. TOTAL <br />17 <br /> b. WITH CURRENT FIRM <br /><1 <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. (Fort Lauderdale, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />MSc Biology, Florida Atlantic University <br />BA Anthropology, Minor in Ecology & Evolutionary <br />Biology, University of Arizona <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />▪ DAN (First Aid, CPR, AED, & Oxygen) <br />▪ Florida Master Naturalist <br />▪ NMFS/MMS Marine Mammal/Protected Species Observer <br />▪ NITROX <br />▪ US Power Squadron Piloting <br />▪ US Power Squadron Safe Boat Operation <br />▪ PADI Rescue Diver <br />▪ PADI Advanced Diver <br />▪ PADI Open Water Diver <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Christie is a senior project manager and marine biologist with over 17 years of experience in the fields of environmental monitoring, <br />assessment, planning, reporting, as well as federal, state, and local regulatory permitting, permit compli ance, and closeout. She is well <br />versed in grant research and funding applications, due diligence/feasibility studies, environmental resou rce surveys including seagrass, <br />hardbottom/reef and coral monitoring and mapping, mangrove and dune vegetation mapping and monitoring, as well as shorebird <br />population and nesting surveys, preparation of management plans, contingency mitigation plans, and r esource monitoring plans. <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Fisher Island Sand Tightening Project, <br />Fisher Island, FL <br /> PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />Ongoing NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Marine Scientist. Conducted a seagrass/hardbottom mapping and coral survey/report in support of the upcoming <br />sand tightening project. The Main Beach and Club Beach termi nal groins along the eastern portion of Fisher Island are <br />permeable, allowing sand to escape the beach and is affecting beach performance and causing shoaling in the adjacent <br />marina. Held pre-application meetings, submitted permit applications and are currently processing them through Miami- <br />Dade County DERM, the FDEP, and the Corps to authorize construction activities. Additionally, had discussions with FWC <br />regarding securing a Special Activity License for relocating corals and have negotiated no relocatio n mitigation to be <br />necessary. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Town of Palm Beach Dock Replacement, <br />Town of Palm Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 2020 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Marine Scientist responsible for the conducting two marine resource surveys of the submerged lands within and <br />surrounding the TOPB public marina and proposed dredge areas, coordinated and participated in pre -application <br />meetings with the Corps, FDEP and Palm Beach County. Acquired the nece ssary state and federal permits to conduct <br />geotechnical surveys, as well as, an FDEP ERP, FDEP Sovereign Submerged Lands Lease modification, a Public <br />Easement, Corps Individual Permit authorizing the demolition of existing docks and over-water buildings, construction of <br />four floating docks with 2 new over-water buildings, and dredging of 78,605 cy of material between -10.4 to -17.1 ft. Also <br />secured approval from Palm Beach County to use the Mid-Depth Artificial Reef and Tarpon Cove Restoration area as <br />disposal sites for the old docks and dredged material in support of the Town Docks Project located at 500 Australian <br />Avenue in Palm Beach. <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Harbor Phase III, <br />Miami, FL <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2018 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm