Laserfiche WebLink
• Establish Work Plan <br />Preliminary Discipline Work Plans <br />• Work Plan Review <br />• Final Work Plan <br />• Client Kick -Off Meeting <br />• Review Project Client Goals <br />• Discuss Risks/Mitigation/Dispute Process <br />• Review Approach and Scope of Services <br />• Review Cost/Scheduling/Estimating <br />• Review Change Management Procedure <br />• Review Draft Project Approach <br />• Review Site Safety Requirements <br />• Schedule Pull Plan Meeting(s) <br />• Establish Meeting Requirements <br />• Develop/Review Control Requirements <br />• Develop CAD Coordination Requirements <br />• Review Standards and Specifications <br />• Initiate Action Item List <br />Finalize Project Approach <br />Osborn SOP - Project Execution <br />The Project Manager is responsible for executing the <br />ongoing various tasks with support of the project team <br />and will monitor weekly and periodically depending on <br />the task. This procedure is based on the premise that all <br />of the previous SOP steps have been completed and the <br />project has been kicked -off. <br />Continuous Project Management provides detailed project <br />execution procedures throughout all phases of a project, <br />while Phased Submission Production generally describes <br />document tracking and requirements of each phase of a <br />typical work assignment. <br />Each work assignment will be prepared as phased <br />submittals for review by the City and the submittals and <br />continuous project management will track concurrently. <br />Osborn SOP - Continuous Project Management <br />• Update Schedule & Budget <br />• Manage Staffing & De -Staffing Requirements <br />• Manage Change Management Process <br />• Manage Invoices & Cash Flow <br />• Complete Periodic Status Reports <br />• Complete Periodic Client Project Reviews <br />• Quality Checking <br />• Interdisciplinary Reviews <br />• Coordinate Bidding/Construction Requirements <br />• Confirm Client Execution Delivery & Model <br />All phased submissions must include a meeting showing <br />the submittal was discussed, comments were noted <br />and the Client approves the submittal. The Client must <br />understand and agree to the content and level of detail <br />included in each submittal. <br />Osborn SOP - Phased Submission Production <br />Phased Submission runs a parallel path to <br />Continuous Project Management <br />• General Document Numbering and Tracking <br />• Code Review <br />• Schematic Design (30%) <br />• Design Development (60%) <br />• Construction Documents (100%) <br />• Professional Seal <br />A copy of the approved submittal package will be saved for <br />our records electronically. The project will not proceed to <br />the next stage without client approval. <br />4VOsborn SOP - Bidding <br />Our role during the Bid Phase of a project varies greatly <br />from project to project. The following procedures provide <br />a comprehensive approach to Bid Phase management in <br />the scenario where the Client is depending on Osborn to <br />manage the bidding process. <br />Osborn SOP - Procurement Assistance <br />• Prepare Legal Notice for Bids/Issue RFP <br />• General Bidding Process and Documentation <br />• Conduct Pre -Bid Meeting at Site <br />• Prepare Pre -Bid Meeting Minutes <br />• Respond to Requests for Information <br />• Prepare Addenda <br />• Prepare Bid Tabulation Log <br />• Attend Bid Opening/Complete Bid Tabulation <br />• Verify Bid Compliance w/ Contract Documents <br />• Bid Award Recommendation <br />• Assist Client in Contract Preparation <br />Osborn SOP - Construction Administration <br />The Osborn Engineering Team will provide support services <br />during construction including review of shop drawings, <br />requests for information (RFIs), quality assurance/ <br />quality control (QA/QC) material testing, site observation, <br />reporting, and preparation of record drawings. <br />For each project, the Osborn Team will outline the specific <br />construction administration services on a task -by -task <br />basis. The services will be tailored to the project and <br />will depend on funding source (i.e. local, state, Federal), <br />duration of project, location of the project and estimated <br />construction cost. <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION D - PAGE 15 <br />