My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. BEHAR & CO.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
R.J. BEHAR & CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:25:35 AM
Creation date
8/24/2020 11:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITYWIDE PEDESTRIAN SAFETY PROJECT <br /> CITY OF DANIA BEACH <br />CLIENT: <br />City of Dania Beach <br />Public Services Department <br />1201 Stirling Road <br />Dania Beach, FL 33004 <br />Mr. Colin Donnelly <br />CIP & Grants Administrator <br />Phone: 954-924-6808 x3618 <br />Fax: 954-923-1109 <br />E-mail: cdonnelly@daniabeachfl.gov <br />RJ BEHAR’S ROLE: <br />Construction Engineering Inspection <br />(CEI) services <br />PROJECT STARTED: 10/08/2019 <br />PROJECT COMPLETED: 8/2020 <br />COST/FEES PAID: $90,887.20 <br />CONSTRUCTION COST: <br />$459,199.40 <br />TIME EXTENSIONS: COVID-19 <br />Delay of two weeks <br />CITY PROJECT ITB NO.: 19-004 <br />FEDERAL AID PROJECT # D418- <br />112-B <br />FM NO.: 438282-1-58-01 <br />RJ BEHAR’S KEY PERSONNEL: <br />Robert J. Behar, PE <br />Principal in Charge <br />Nestor Santana, PE <br />Project Manager <br />Michael Owensby <br />Senior Inspector/P.A. Assistant <br />Logan Fasanella <br />Field Inspector <br />Zugeil Velez <br />Resident Compliance Specialist <br />R.J. Behar & Company, Inc. (RJ Behar) is providing Construction <br />Engineering Inspection (CEI) services for the Citywide Pedestrian Safety <br />Project. <br />This project is receiving FHWA Federal Funding via the Florida <br />Department of Transportation (FDOT) LAP Program. The project is <br />designated as an "Off the State Highway (Off-System) LAP Project". <br />In addition to inspection and coordination, RJ Behar coordinated with <br />and provided FDOT with all the required information to ensure <br />compliance with all LAP requirements. <br />As part of the CEI inspection duties, RJ Behar performed daily <br />inspections, produced weekly reports, monitored the contractor’s pay <br />items, held progress meetings, prepared the meeting agendas, processed <br />payment applications, monitored shop drawings and RFIs, performed <br />Temporary Traffic Control Plan Reviews including the coordination of <br />lane closures, carried out the stormwater pollution prevention plan site <br />reviews per NPDES requirements, conducted the material sample <br />reviews and approvals (LIMS), reviewed the EEO Submittals, reviewed <br />the Contractor & Subcontractor’s payrolls, uploaded project documents <br />in FDOT Lap-It, and performed final closeout. <br />Section F - Page | 4
The URL can be used to link to this page
Your browser does not support the video tag.