My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. BEHAR & CO.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
R.J. BEHAR & CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:25:35 AM
Creation date
8/24/2020 11:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIVERVIEW PUMP STATION NEW GENERATOR, FIRE SUPPRESANT AND <br />MAIN SWITCH DISCONNECT <br />CITY OF MIAMI, FLORIDA <br />Exist. Generator <br />CLIENT: <br />City of Miami <br />Department of Public Works - <br />NPDES Section <br />444 S.W. 2nd Avenue, 8th Floor <br />Miami, Florida 33130 <br />Ms. Maria Gabriela David, E.I. <br />Ph.: (305) 416-1244 <br />Fax: (305) 416-1278 <br />E-mail: mdavid@miamigov.com <br />RJ BEHAR’S ROLE: <br />Project Management, Electrical <br />design, Cost estimates and <br />Specifications <br />PROJECT STARTED: 11/10/2017 <br />PROJECT COMPLETED: 2019 <br />COST/FEES PAID: $74,200 <br />CONSTRUCTION COST: <br />$935,000 (est.) <br />PROJECT #: M-0127 <br />RJ BEHAR’S KEY PERSONNEL: <br />Juan. H. Vazquez, PE, PH, BCEE <br />Principal in Charge <br />Reynaldo Orozco, PE <br />Electrical Engineer <br />Richard Bolt <br />Cost Estimates and Specs <br />Kira Leon, EI <br />Plans Preparation <br />Jossmel Cruz <br />Structural Designer <br />R.J. Behar & Company, Inc. (RJ Behar) was contracted to provide <br />engineering services for the replacement of the Riverview Pump Station <br />Generator and pumps interconnection in the City of Miami. <br />The Riverview Pump Station is located at 1301 NW 6th Street, <br />approximately 500 ft. east of the Marlin’s Baseball Park. The pump <br />station is part of the City's stormwater system that includes 12 <br />stormwater pump stations, 1.36 million feet of pipes, over 14,400 catch <br />basins and manholes and 257 outfall structures. In 2013, the City <br />removed two axial pumps and respective motors and installed two new <br />Fairbanks Morse 35,000 GMP Axial Flow Pumps and two 500 HP <br />motors at the Riverview Pump Station. The work on this project included <br />the removal of the existing generator and the installation of a new <br />generator. <br />The engineering analysis included the following: <br />1.Analysis of two possible scenarios for sizing the new generator. <br />2. Design and Plans Preparation <br />3.Project Specifications <br />4.Estimates of Probable Costs <br />Services will also include Engineer of Record Post Design Support and <br />Construction Management Assistance. The design also included the <br />structural design of the new generator foundation. <br />The project also includes <br />design of a new Fire <br />Suppressant System and <br />Main Switch Disconnect <br />for the Pump Station. <br />This portion of the work <br />is being done by a <br />subconsultant. <br />Section F - Page | 8
The URL can be used to link to this page
Your browser does not support the video tag.