My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Eisman & Russo, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Eisman & Russo, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 3:09:57 PM
Creation date
8/24/2020 3:09:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Issue Identification and Resolution (weight=.14) <br />1. Acted proactively when identifying issues by working with various stakeholders including <br />utilities, cities, counties, and the contractor so as to minimize time and cost overruns. <br />4 <br />2. Conducted thorough analysis of issues including a review of various alternative solutions <br />with enough detail and back-up to show logic behind alternatives. Provided documentation for <br />time and cost impacts as required by CPAM. <br />4 <br />3. Made decisions appropriate with authority and based these decisions on solid logic and <br />enough supporting detail to demonstrate a well-researched effort. Decisions/recommendations <br />consistent with the analysis. <br />4 <br />4. Resolved issues in a timely manner so as to eliminate and/or minimize time and cost impacts <br />to the project. Escalated issues to the Department only when efforts towards resolution had <br />reached an impasse, the issues were beyond the consultant's authority, or when project delays <br />could result. <br />4 <br />Average Score 4.0 <br />Rating Scale: 1 - 5 <br />FDOT Evaluator Section Comments: <br /> <br />Page 4 of 8
The URL can be used to link to this page
Your browser does not support the video tag.