My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3087
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 11:43:42 AM
Creation date
9/15/2020 5:03:05 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3087
Date (mm/dd/yyyy)
07/16/2020
Description
Approving 5th Amend w/O’Leary Richards Design Assoc. Add'l Landscape Svcs. re: Meditation Garden
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Prepare gateway feature and metal vine trellis details and <br />specifications. <br />E. Prepare dimensioned Layout Plan. <br />F. Prepare Paving Plan of paving fields for pedestrian sidewalk areas <br />with specifications including paver type, pattern and color. <br />G. Prepare Enlarged Paving plan of "yoga" circle. <br />H. Prepare a detailed Irrigation Plan. <br />I. Final coordination with commissioned artists for fountain base, shade <br />cloth for eastern pavilion and sculpture base). <br />J. Prepare a Schematic Landscape Lighting Plan indicating location and <br />type of fixtures with details and cut sheets. The Landscape Lighting <br />Plan will be prepared in order to accentuate commissioned artwork <br />and landscape improvements. <br />K. Prepare technical specifications suitable for bidding. General <br />Conditions to be provided by City. <br />L. Prepare Probable Statement of Construction Costs. <br />M. Coordination with permitting agencies. <br />N. Attend working meetings with the City representatives, as required. <br />III. Permitting <br />A. Coordination with permitting agencies. <br />B. Assist City by incorporating permitting agency's review comments <br />and re -issuing drawings as revisions for final sign-off's by the agencies <br />and departments having jurisdiction. It is understood that the City <br />shall be solely handling the effort associated with the permitting <br />process through the required permitting agencies. <br />IV. Bidding <br />A. Attendance at pre-bid conference. <br />B. Respond to bidder inquires in response to RFI's raised during the <br />bidding phase. <br />V. Construction Observation <br />A. Review change order requests. <br />B. Review contractor RFI's and issue necessary clarifications and <br />interpretations of the construction documents. <br />C. Assistance in reviewing Requests for Payment from Contractor <br />throughout project duration. <br />D. Prepare necessary revisions to the plans. <br />E. Perform a maximum of (6) observations to determine if the work is <br />being performed in accordance with the contract documents. <br />F. Final project close out: Conduct a final walk-through and provide <br />--punch-list-of incomplete -items. <br />G. Provide a follow-up walk-through for verification and review <br />pertinent close-out documents required by the contract documents. <br />VI. Project Management <br />A. Coordinate the services of sub -consultant and manage overall <br />project. <br />Subconsultant <br />Subconsultant included for civil and electrical design services is as follows: <br />A. Civil & Electrical Engineering: Ross Engineering, Inc. <br />(See Attachment 1 for respective scope of work) <br />
The URL can be used to link to this page
Your browser does not support the video tag.