My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golden Shores Utility Underground Specs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Golden Shores Utility Underground Specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 9:39:02 AM
Creation date
10/28/2020 9:38:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CTA Project No. 19-0035-001-01 01550-3 Golden Shores Street Lighting <br />October 12, 2020 SIB Bid No. 20-09-01 <br />B. All dirt or debris spilled from the CONTRACTOR's trucks on existing pavements shall be <br />removed by the CONTRACTOR immediately. <br />1.06 SECURITY <br />A. The CONTRACTOR shall employ watchmen and security guards as necessary to <br />protect the job site against vandalism, burglary, theft, trespassing, etc. The <br />CONTRACTOR shall care for and protect against loss or damage of all material to be <br />incorporated in the construction for the duration of the project and shall repair or replace <br />damaged or lost materials and damage to structures. The CONTRACTOR shall be <br />responsible for providing, maintaining and securing gates used for construction purposes <br />for the duration of the project. <br /> <br />PART 2 - PRODUCTS (Not Used) <br /> <br />PART 3 - EXECUTION (Not Used) <br /> <br /> - END OF SECTION -
The URL can be used to link to this page
Your browser does not support the video tag.