Laserfiche WebLink
<br />CTA Project No. 19-0035-001-01 01570-1 Golden Shores Street Lighting <br />October 12, 2020 SIB Bid No. 20-09-01 <br />SECTION 01570 - MAINTENANCE OF TRAFFIC <br /> <br /> <br />PART 1 - GENERAL <br />1.01 DESCRIPTION OF WORK <br />A. Provide all items necessary to protect, warn and/or maintain vehicular and pedestrian <br />traffic during the course of construction. <br />B. The CONTRACTOR shall arrange for the services of a Traffic Engineer/Consultant, <br />registered as a Professional Engineer in the State of Florida or Certified by the State of <br />Florida, to prepare detailed Maintenance of Traffic (MOT) Plans for permit approval by <br />the City, the Florida Department of Transportation (FDOT), County Traffic Engineering <br />Division, and other governmental agencies having jurisdiction prior to the start of <br />construction activities. <br />C. The Maintenance of Traffic Plan and all traffic warning and control devices shall conform <br />to the applicable provisions of the latest editions of the national “Manual on Uniform <br />Traffic Control Devices” (MUTCD), the 600 series of the Florida Department of <br />Transportation’s “Roadway and Traffic Design Standards”, and County’s Minimum <br />Standards Applicable to Public Rights of Way. <br />D. There will be no separate payment for the fee for Engineering Services , if required. <br />1.02 TRAFFIC PLAN <br />A. The CONTRACTOR shall submit the detailed MOT Plans to the ENGINEER, City, <br />County, and FDOT, as applicable for review and permit approval, two weeks before the <br />Pre-Construction Meeting. The detailed MOT Plans must identify at a minimum; each <br />phase of the work, traffic flows during each phase, the proposed location of construction <br />signs, channelizing devices, temporary paveme nt markings and symbols, lighting <br />devices, barrier walls, modifications to traffic signals and all other required devices as <br />applicable. No work within the public right-of-way shall commence until the detailed <br />M.O.T. Plans have been approved in writing by all governmental agencies having <br />jurisdiction. Upon the start of construction, the CONTRACTOR shall comply with all <br />provisions of the detailed Maintenance of Traffic Plan s. In the event of non-compliance <br />by the CONTRACTOR, the ENGINEER will have the authority to order the <br />CONTRACTOR to cease construction operations without compensation of time or <br />money until the violations have been corrected. <br />B. The detailed Maintenance of Traffic Plan shall include provisions for pedestrian traffic as <br />well as vehicular (including bus) traffic. <br />C. The Maintenance of Traffic Plan shall show and describe proposed location and time <br />durations of the following as applicable: <br />1. Public vehicular traffic routing. <br />2. Traffic blockage and lane closings anticipated due to constr uction operations. <br />3. Staging/storage areas and haulage routes. <br />4. Allowable on-street parking in vicinity of work site. <br />5. Access to buildings adjacent to work site. <br />6. Driveways which will be blocked by construction operations.