My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golden Shores Utility Underground Specs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Golden Shores Utility Underground Specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 9:39:02 AM
Creation date
10/28/2020 9:38:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CTA Project No. 19-0035-001-01 02780-4 Golden Shores Street Lighting <br />October 12, 2020 SIB Bid No. 20-09-01 <br />2. Mason sand is not acceptable. <br />PART 3 - EXECUTION <br />3.01 EXAMINATION <br />A. Examine and verify that receiving substrate surfaces have no defects or errors whi ch <br />would result in poor or potentially defective application or cause latent defects in <br />workmanship. <br />1. Conditions of Surfaces <br />a. Clean, free of oil, water, moisture, laitance, or any other deleterious <br />substances. <br />b. The base course shall be shaped top-grade and cross section with an <br />allowable tolerance of 1/4". <br />c. Twelve-inch compacted subgrade compacted to 95% maximum density <br />per AASHTO T-180 with a minimum LBR of 40. <br />d. Report any unsatisfactory conditions to the LANDSCAPE ARCHITECT. <br />e. Starting installation shall imply acceptance of surfaces. <br />3.02 PREPARATION <br />A. Substrate Surface <br />1. Prepare substrate surfaces to insure proper and adequate installation, in exact <br />accordance with the Contract Documents, approved sample panels and <br />manufacturer's requirements. <br />B. Field Measurements <br />1. Field measure and verify dimensions as required. <br />C. Protection of Adjacent Areas of Surfaces: <br />1. Protect adjacent areas or surfaces from damage as a result of the Work of this <br />Section. <br />3.03 INSTALLATION <br />A. Install in exact accordance with manufacturer's latest requirements, instructions, <br />specifications, and details. <br />B. Install compacted coarse granular base in accordance with FDOT specifications and <br />those shown in the drawings. <br />C. Place and screen sand to depths shown and to give a final even grade to top of pavers <br />after compaction.
The URL can be used to link to this page
Your browser does not support the video tag.