Laserfiche WebLink
<br />Right-of-Way/Easements <br />The Combined Easement Plan image on the previous page shows the three easements already acquired <br />from the Winston Towers property on the west side of Collins Avenue. The right-of-way line is the back of <br />sidewalk along 174th Street and Collins Avenue. The permanent easement is a 40 x 60-foot area (blue) <br />with a temporary construction easement (grey) on the west and south side. There is a 12-foot utility <br />easement strip (orange) to the north approaching 174th Street. <br />Utilities <br />The primary objective of the utility <br />coordination process is to identify and resolve <br />all known utility conflicts and reduce the risk to <br />the Bridge Park schedule and budget. Our <br />subconsultant, F.R. Aleman possesses a vast <br />knowledge of the requirements, issues, and <br />processes associated with the coordination and disposition of utilities during the design process. This <br />knowledge avoids delays associated with conflicts. <br />According to Sunshine State One-Call Report (as tabulated below) and our preliminary utility outreach, <br />12 utilities have been identified as being present within the project boundaries. <br />Sunshine State One-Call Data