F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
<br />QUALIFICATIONS FOR THIS CONTRACT
<br />(Present as many projects as requested by the agency, or 10 projects, if not specified.
<br />Complete one Section F for each project.)
<br />20. EXAMPLE PROJECT KEY
<br />NUMBER
<br />2
<br />21. TITLE AND LOCATION (City and State)
<br />E15-DTPW-07: Misc. PSA to Provide General Land & Engineering Surveying
<br />(Miami-Dade County, FL)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (IF APPLICABLE)
<br />N/A
<br />23. PROJECT OWNER’S INFORMATION
<br />A. PROJECT OWNER AND ADDRESS
<br />Miami-Dade Dept.of Transportation & Public Works
<br />111 NW 1st Street, Suite 1300
<br />Miami, FL 33128
<br />D. POINT OF CONTACT NAME
<br />Juan Carlos Cordero, PSM
<br />C. POINT OF CONTACT TELEPHONE AND EMAIL
<br />786.268.5326
<br />Juan.Cordero@miamidade.gov
<br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Includes scope, size, and cost)
<br />Under a Professional Services Agreement, FR Aleman provided as needed general surveying
<br />services for design and construction projects in Miami-Dade County.
<br />WASD Gravity Sewer along NW 27th Avenue between NW 107th Street & NW 123rd Street: FR
<br />Aleman provided subsurface utility engineering (SUE) and surveying services to locate identified
<br />utilities and designate sufficient locations to delineate the existing underground utilities. The
<br />designation and location was performed via ground penetrating radar (GPR). To identify the utilities,
<br />color-coded above ground markers (i.e., pk nails, steel rods, paint, etc.) were installed directly above
<br />the centerline of the utility structure and the elevation was recorded. Field crews used tablets with
<br />Survey 123 and automated dropdown menus to collect all required information, take photos of the
<br />utility and surrounding area, sketch the location, and record the GPS locations. This information
<br />is instantly sent to the office to QA/QC the work and begin any CAD work. By collecting the GPS
<br />locations of each utility, this information can also be easily uploaded into any GIS database. The
<br />final deliverable to the client included 3D Test Hole Reports with thorough utility information, such
<br />as a description, pipe size, utility owner, condition, horizontal and vertical location, a sketch of the
<br />surrounding area, and GPS coordinates. These Test Hole Reports also documented who performed
<br />the work in the field and a QA/QC sign off from the field, office, and project manager, ensuring our
<br />client receives the most accurate information. This work order included 82 test holes.
<br />SW 328th Street from SW 187th Avenue to US 1: FR Aleman provided SUE and surveying services
<br />to locate identified utilities and designate sufficient locations to delineate the existing underground
<br />utilities. To accomplish this, FR Aleman performed utility locating via vacuum excavation for 29 test
<br />holes. To identify the utilities, color-coded above ground markers (i.e., pk nails, steel rods, etc.) were
<br />installed directly above the centerline of the utility structure and the elevation was recorded. As
<br />deliverables, FR Aleman provided Test Hole Reports and CAD files. The Test Hole Reports included
<br />pertinent utility information, such as description, pipe size, utility owner, condition, horizontal and
<br />vertical location, and a sketch of the surrounding area.
<br />Fire Station #24, Air Rescue South: FR Aleman provided an update to the Specific Purpose Survey
<br />Map for the Fire Station #24, Air Rescue South site. The Survey Map included all above ground
<br />existing improvements within the project site. Field visits were performed to update features that
<br />were missing in the original map, such as curbs, trees, tanks, etc. The updated Specific Purpose
<br />Survey also showed existing drainage structures within the project site.
<br />Tree Island Park & Preserve: FR Aleman prepared Boundary and Topographic Surveys on the
<br />approved Tentative plat for the Tree Island Park and Preserve. The Topographic Survey updated all
<br />above ground features within the existing Right-of-Way, as well as obtaining a 50-foot elevation
<br />grid. At this site, FR Aleman also provided a Final Plat.
<br />25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT
<br />(1) FIRM NAME
<br />FR Aleman & Associates
<br />(2) FIRM LOCATION (City and State)
<br />Miami, FL
<br />(3) ROLE
<br />Prime
<br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016)
|