My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 11:01:33 AM
Creation date
11/23/2020 10:59:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Olsen Deronvil Senior Designer - Traffic 9 1 <br />Choice Engineering Consultants, Inc (Miami, FL) <br />BS in Electrical Engineering (in progress) <br />MOT Advanced Certificate <br />IMSA Level II <br />SR A1A/Collins Avenue NB & Indian Creek Drive SB–Ride-Only Project - FDOT D6 Ongoing Since 2020 <br />Senior Designer responsible for the development of the signalization design of SR A1A/Collins Avenue NB and SR 907/63rd Street. This project included vehicular <br />detection upgrade with Microwave detection, retrofitting existing cabinet assemblies with new vehicular and pedestrian detection, impacted pull boxes (traffic signal <br />and lighting) replacement. <br />NW 125 Street ACST Signalization Plans from NW 7 Ave to I-95 Ramps - FDOT D6 <br />ADA Districtwide Consultant - FDOT D6 <br />Traffic Operations Safety Studies - FDOT D6 <br />Florida’s Turnpike Enterprise General Engineering Consultant - FTE <br />Ongoing Since 2018 <br />Ongoing Since 2019 <br />Ongoing Since 2018 <br />Ongoing Since 2018 <br />Senior Designer responsible for coordinating with team members to develop the signalization design of the Adaptive Signal Control Plans along NW 125th Street from <br />NW 7th Ave to NW 6th Avenue. This project included design of full actuation, Video or Microwave detection, retrofitting existing cabinet assemblies with new <br />vehicular and pedestrian detection, the installation of Econolite Signal controller adaptive module, and adding manual transfer switch for the I-95 and 125th street <br />cabinets. <br />Senior Designer involved in the development of conceptual improvement plans, design and construction cost estimates for traffic engineering studies throughout <br />Miami-Dade and Monroe County. Responsible for identifying lighting, and signalization needs related to the proposed safety improvements. Assisted with the <br />production of the following study: Task #42_Safety Study and Lighting Study. <br />Senior Designer responsible for the implementation/review of ADA improvements performed by the District, ADA Plan Reviews, preparation of construction plans for <br />ADA only improvements to be constructed through the Work Program, technical memos addressing citizen and municipality complaints. <br />Traffic Engineering Designer supporting the lead reviewer in all of the roadway lighting, tolling infrastructure electrical, and ITS plan reviews of all the TPK facility <br />improvement projects including major re-construction of the Florida Turnpike Service Plazas, and Suncoast and Veterans Expressway Expansions.
The URL can be used to link to this page
Your browser does not support the video tag.