My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pedelta
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Pedelta
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 12:15:43 PM
Creation date
11/23/2020 12:07:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEDELTA <br />Sunny Isles. This budget will be reviewed at the 60% submittal and at the 100% submittal and will be <br />provided through an Earned Value Curve Projection. Pedelta will bring a hands-on know how of its personnel <br />with extensive construction experience and project management to assist the Owner with cost control and <br />budget projections throughout the construction process. <br />Andrea Travani, with his sound Project Management background earned in managing construction FDOT <br />jobsites in Florida but also all over the US and internationally, will supervise this process. Andrea's approach <br />will be practical but at the same time proving the Owner with the highest engineering quality delivered <br />together with a laser focus on construction safety. <br />DETAILED PROJECT APPROACH <br />The Design Team is energetically committed to an open-minded and inclusive collaborative technical approach <br />to provide the engineering services to meet the City of Sunny Isles expectations with timely and cost-effective <br />solutions. We will develop a clear and appropriate strategy from rigorous engagement with the different <br />realities of the projects' sites. <br />Our project manager Andrea Travani is familiar with the steps to take to present the project improvements to <br />public officials, stakeholders and the community, and the effectiveness of experience in public communications <br />and outreach services, to make this project a success from the preliminary stages to the completion of <br />construction. <br />City of Sunny Isles Beach <br />Request for Qualifications No. 20-10-01 <br />-22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.