<br />City of Sunny Isles Beach | Invitation to Bid No. 21-08-01 18 <br /> <br /> <br />SECTION 3 <br />SCOPE OF SERVICES <br /> <br />3.1 BACKGROUND <br /> <br />The City of Sunny Isles Beach is seeking bids from qualified Bidders to provide installation of <br />ductbank, conduit, and equipment pads for the conversion of overhead to underground utilities. <br />Construction will consist of approximately 14,000 LF of ductbank including setting of transformer <br />and equipment pads, Vista Switch Cabinets, manholes, handholes, splice boxes, and junction boxes <br />as associate with conversion of FPL, AT&T, Atlantic Broadband services from overhead to <br />underground including additional conduit for City. Upon completion of ductbank installation, <br />roadways throughout the neighborhood are to be milled and resurfaced. Equipment and conduit <br />for FPL to be provided by FPL for installation by contractor. <br /> <br />In addition, there are two sub-projects included within this ITB, one for Additional Sidewalk along <br />Atlantic Avenue connecting to Collins, the other for enhancements to the Urban Walkway project <br />along Collins between 189th Street and 191st Street. Plans for each are included within this ITB. <br /> <br />Services include all testing, traffic control, site restoration, appurtenant and miscellaneous items <br />necessary for a complete, functional, and satisfactory installation in accordance with the terms, <br />conditions, and specifications contained in this ITB. <br /> <br /> <br />3.2 RELATED CONTRACT ACTIVITIES <br /> <br />A. The Contractor shall comply with all Municipal, County, State and Federal laws, rules and <br />regulations applicable to the work and the execution of the work. <br />B. The Contractor shall employ and pay for a Land Surveyor registered in the State Of Florida to <br />establish all elevations, lines and levels including right-of-way and property lines. <br />C. The Contractor shall be responsible for prompt notification to the Owner and timely field repairs in <br />the event that the Contractor damages any of the Owner’s existing properties or overhead/ <br />underground utilities. <br />D. The Contractor shall utilize storage/staging areas identified by City for materials and equipment. <br />The Contractor shall coordinate deliveries in accordance with the construction schedule and these <br />specifications, so that materials do not pose an unnecessary long-term nuisance to motorists or <br />residents. Excavated materials and/or backfill materials shall not be stored in the roadway right- <br />of-way. If suitable for backfill elsewhere, excavated material must be stockpiled within the staging <br />area. Materials unsuitable for backfill must be removed and disposed of immediately. <br /> <br />• Open trenches must be backfilled/plated, and barricades removed while maintaining <br />adequate safety measures. <br />• Streets must be graded/leveled to provide maximum assurance against personal injury, <br />vehicle damage, etc. <br />• Streets temporarily restored, as described above, must be regularly maintained. For