My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rohl Global Networks
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Rohl Global Networks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:53:19 PM
Creation date
9/28/2021 4:49:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c ROHL <br />GLOBAL. NETWORKS <br />Alternative backfill methods including substantial use of flowable fill were incorporated <br />in the process. <br />a. Project 2. - Sunny Isles Beach (SIB) Atlantic Corridor Utility Undergrounding and Street <br />Lighting <br />The Atlantic Corridor is a primary residential route extending approximately two thirds of the <br />length of the community — one and one half miles long. It includes access to one of the largest <br />elementary public schools in Dade County, and contains entry's and exits to commercial <br />properties fronting onto Collins Avenue along with significant residential property's both high <br />rise and single family. This is a separate and distinct contract with SIB due to timing, funding <br />and scope which includes a decorative street light project. <br />Government Center, centrally located in the City is at 18070 Collins Avenue, Sunny Isles Beach <br />FL 33160 which serves as the official project address. <br />b. The project scope includes the installation of conduit, hand holes, equipment slabs, <br />chambers, physical FPL equipment, limited placement of conductor and fiber cable for FPL, <br />ABB, ATT, Comcast, Hotwire, and City fiber, lighting and security systems. Restoration of <br />roadways, sidewalks, driveways and landscaped areas consisting of concrete curbs, gutters, <br />asphalt paving, paver brick and concrete sidewalks. And a complete new decorative street <br />lighting project consisting of precast and cast in place foundations, power sources, conduit <br />and handhole infrastructure, installation of one hundred and thirty stand alone decorate <br />lighting fixtures. <br />Initial contract value is $6,984,466.00 <br />The Owners Representative for the project is HPF Associates, Inc., Paul T. Abbott, 14803 <br />SW SR 45 Archer, FL 32618, 305-773-6255, ptgbhtl@AOL.com. <br />d. The projects substantial completion, per contract requirements, is March 31, 2019. And <br />as with Contract 1 above is driven by the FDOT RRR project which impacts the physical <br />removal of overhead utility lines along Collins and must occur prior to the installation of <br />the decorative street lighting. <br />e. RGN was responsible for design input regarding value engineering alternatives, means <br />and methods, scheduling, securing material through a competitive bidding process, <br />execution and installation of the afore noted equipment and services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.