My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-10-01) Space Needs Assessment Feasibility Study (CCNA)
>
RESPONSES
>
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 12:15:22 PM
Creation date
12/1/2021 12:14:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C P Z <br /> <br /> CURRENT & PROJECTED WORKLOAD <br />CPZ ARCHITECTS, INC. <br />4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 <br />1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 <br />200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 <br />(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM <br /> <br /> <br /> <br />Westside Maintenance Facility Master Plan, Coral Springs, Florida <br />CPZ Architects was retained to redesign the existing Westside Complex for the <br />City of Coral Springs to be developed in phases to an overall campus master plan. <br />site. <br />Phase: Construction Administration Cost: $25 million Completed: April <br />2022 <br />Projected Workload: <br />Flamingo Gardens Welcome Center, Davie, Florida <br />CPZ provided design services for the Welcome Center at the Flamingo Gardens, <br />a botanical garden and bird sanctuary park in Davie, Florida. The facility will <br />include a Visitors Center, gift shop, restaurant, multi-purpose rooms, and <br />administrative offices and supporting spaces. Site improvements include new <br />parking, site lighting and landscape upgrades. <br />Phase: Construction Administration Scheduled Completion: 2023 <br />CPZ Architects, Inc. was selected to provide design, permitting, planning, <br />engineering and construction administration services for a new facility to <br />consolidate Port Facilities Maintenance and Operations from the current functions <br />that are located within various buildings throughout the Port Everglades campus <br />into a central location. The Project is intended to take place in three phases. The <br />first phase will be the programming phase. The second phase will be the design <br />and preparation of construction documents and permitting phase. The third phase <br />will be the construction of the facility. <br />Phase: Contract Negotiations Scheduled Completion: 2023
The URL can be used to link to this page
Your browser does not support the video tag.