Laserfiche WebLink
C P Z PROJECT APPROACH & UNDERSTANDING <br /> <br /> <br />CPZ ARCHITECTS, INC. <br />4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 <br />1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 <br />200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 <br />(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM <br /> <br /> <br /> <br /> <br /> Cost Control Techniques <br />Schedule Control – Our Firm works with our clients to determine the project schedule at the start of the <br />project to include the Design Phase, Permitting Submittals, and estimated construction phase. We then create <br />an electronic schedule that can be maintained throughout the project. This schedule is reviewed at the <br />completion of each phase of the project. If the project falls behind schedule, we determine what is required to <br />bring the project back on schedule and make the necessary revisions. We can add additional people to the <br />project, extend work hours or both if these methods will expedite the project. Other scheduling solutions may <br />include changing the sequence of activities to maintain the project moving to completion. <br /> <br />(Your Project) <br />Tract “A” 18,277 SQ FT <br />Tract “B” 26,466 SQ FT <br />Tract “C” 98,399 SQ FT <br />Possible Conceptual Site Layout <br />• New Construction <br />• Parking Structure <br />• Renovation <br /> <br />Note: Possible Conceptual <br />Layout shown is a conceptual <br />diagram to show we understand <br />scope based on RFP.