My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ 21-10-01_Architects Design Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-10-01) Space Needs Assessment Feasibility Study (CCNA)
>
RESPONSES
>
RFQ 21-10-01_Architects Design Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 12:34:44 PM
Creation date
12/1/2021 12:33:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY NUMBER <br />3 <br /> 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />CLERMONT POLICE HEADQUARTERS <br />CLERMONT, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br />2015 2017 <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT PHONE NUMBER <br />CITY OF CLERMONT CHARLES BROADWAY, CHIEF OF POLICE (352) 394 - 5588 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (INCLUDE SCOPE, SIZE AND COST) <br />To provide the Clermont Police Department with adequate space for improved <br />services, safety, and increased staffing levels, Architects Design Group developed <br />a spatial needs assessment, master plan, and site analysis for an addition and <br />renovation to the existing police headquarters. Strategic planning included a new <br />secure sally port, expanded booking and intake, holding area, specialized property <br />and evidence storage areas, and technologically advanced records retention area. <br />Due to numerous issues including parking, cost to renovate the existing building, <br />and community concerns, the addition and renovation approach was determined <br />to be unfeasible. The city then entered a developer’s agreement to purchase a <br />pad-ready site from local developer. ADG was hired by the city to provide design, <br />permitting assistance, and construction administration services for the new site. <br />The completed 30,611-SF building is a two-story structure which includes booking <br />and intake, holding cells area, an evidence processing lab, evidence bulk storage, <br />a training classroom, and a sally port, in addition to the regular administration <br />areas needed in a facility of this nature. <br />Clermont Police Department’s booking and intake suite included a double sally <br />port, bio-hazard and decontamination room, evidence vault, breathalyzer room, <br />and AFIS (Automated Fingerprint Identification System) station. The female <br />detention area has a single multiple-occupancy cell and a juvenile cell with visual <br />separation. The male detention area has an enlarged multiple-occupancy cell, a <br />restraint chair, and secured restroom. <br />25. FIRMS FOR SECTION C INVOLVED WITH THIS PROJECT <br />A (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />ARCHITECTS DESIGN GROUP WINTER PARK, FL ARCHITECT OF RECORD <br />B (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />TLC ENGINEERING SOLUTIONS ORLANDO, FL SECURITY & TECHNOLOGY <br />37
The URL can be used to link to this page
Your browser does not support the video tag.