My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ 21-10-01_Architects Design Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-10-01) Space Needs Assessment Feasibility Study (CCNA)
>
RESPONSES
>
RFQ 21-10-01_Architects Design Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 12:34:44 PM
Creation date
12/1/2021 12:33:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY NUMBER <br />9 <br /> 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />KNOXVILLE PUBLIC SAFETY FACILITY <br />KNOXVILLE, TN <br />PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br />2019 Est. 2022 <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT PHONE NUMBER <br />CITY OF KNOXVILLE EVE THOMAS, CHIEF OF POLICE (865) 215 - 7000 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (INCLUDE SCOPE, SIZE AND COST) <br />Architects Design Group is serving as the public safety design architect, in <br />association with a local firm, to provide a new home for the city’s public safety <br />departments. The project encompasses 172,883-SF of renovated space and 8,000- <br />SF of additions. The scope of services for this project includes developing a spatial <br />needs assessment, master planning of the entire campus, renovation plan, full <br />design documents, interior design, and construction oversight. <br />This project was several years in the making; several sites and design delivery <br />options were considered. Ultimately in 2019, the city decided to utilize an <br />abandoned hospital complex, just north of downtown, to combine policing <br />operations, fire-rescue administration, municipal courts, and pension offices into <br />a consolidated public safety campus. <br />A large portion of the existing hospital will be demolished, leaving three buildings <br />and two structured parking garages to be renovated. The two existing multi-story <br />garages will provide secured parking for police and fire staff, as well as city- <br />owned vehicles. A portion of the two existing garages will be converted to provide <br />storage, vehicle processing, radio maintenance, and a single-lane firing range to <br />allow officers to maintain the required certification. <br />25. FIRMS FOR SECTION C INVOLVED WITH THIS PROJECT <br />A (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />ARCHITECTS DESIGN GROUP WINTER PARK, FL ARCHITECT OF RECORD <br />B (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />TLC ENGINEERING SOLUTIONS ORLANDO, FL SECURITY & TECHNOLOGY <br />43
The URL can be used to link to this page
Your browser does not support the video tag.