Laserfiche WebLink
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 TAMMy COOk-WeeDON <br />TAMMY COOK-WEEDON, PLA, LEED AP+C <br />Calvin, Giordano & Associates, Inc. <br />B.S. Landscape Architecture, 1987 Registered Professional Landscape Architect Florida <br />LeeD AP BD+C Registered Professional LA <br />Fort Lauderdale, FL <br />Texas A&M University College Station No. 0001328 <br />No. 10066306-AP-BD+C South Carolina LSA No. 1485 <br />Ms. Cook-Weedon leads the Landscape Architectural staff, has over 33 years of landscape architectural experience with demonstrated <br />strengths in creative design, graphic presentations, and planting design. She has successfully completed numerous large-scale projects, <br />which encompassed design studies, planting designs, natural area development and the various inter-related professions and tasks necessary <br />to manage the projects through to completion. Ms. Cook-Weedon manages a staff of eleven at CGA where she provides scheduling, addresses <br />CAD staffing and directs design issues as well as monitors budgets and serves on the Executive Management team. <br />LANDSCAPE ARCHITECT 33 23 <br />Joe DiMaggio Childern’s Hospital Vertical expansion <br />Hollywood, Florida <br />Ms Cook-Weedon contributed to the design team’s LEED Certification process. <br />2017 <br />Soccer Field Conversion at Weston Regional Park <br />Weston, Florida <br />Ms. Cook-Weedon managed staff of the landscape architecture department to convert four of the City’s existing grass soccer fields to <br />synthetic turf fields. These conversions will be the first of two park field conversions in the city. The selected synthetic turf option uses an <br />organic infill material rather than the standard black rubber material. Early test results indicated players raving about the playing surface. <br />Services included Civil Engineering as well. Cost: $350,000.00 Construction cost estimated at $3.5 million. <br />2014 - 2016 2018 <br />Joe DiMaggio Children’s Hospital Visitor’s Clubhouse <br />Hollywood, Florida <br />Prepared the site and landscape design for a restorative garden with a playground area specifically for the use by children users of the <br />Joe DiMaggio facility. Cost: $250,000 Construction cost is estimated at $2.5 million. <br />1995 2000 <br />63