My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP 22-04-01 CITYWIDE FIBER NETWORK DEPLOYMENT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 22-04-01 Citywide Fiber Network Deployment
>
Specifications
>
RFP 22-04-01 CITYWIDE FIBER NETWORK DEPLOYMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 10:00:52 AM
Creation date
4/7/2022 10:00:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 22-04-01 38 <br /> <br />All cases shall be sized to accommodate cable sizes that are housed in the splice case. Contractor shall <br />include splice trays, label all fiber coming in and out of splice case, and protect each fusion splice with <br />heat shrink protectors. <br />4.5 Photos <br />Contractor shall take a photo of each splice tray and document as part of the deliverables with the test <br />results. All photos shall be labeled with location, date, tech name, company and description of the <br />completed splice. <br />4.6 Fiber-Optic Cable Termination Assemblies <br />Cable termination assemblies (connectors, pigtails and couplers) shall be products of the same <br />manufacturer. The cable used for cable assemblies shall be made of fiber meeting the performance <br />requirements of these special conditions for the F/O cable being connected, except that the operating <br />temperature shall be modified to -20°C to +70°C. <br />Manufacturer’s attenuation test results shall be provided for all cable assemblies. <br />4.7 Optical Fiber Connectors <br />All optical fiber termination components shall meet or exceed the applicable provisions of TIA/EIA-455-B, <br />Standard Test Procedure for Fiber-Optic Fibers, Cables, Transducers, Sensors, Connecting and Terminating <br />Devices, and Other Fiber-Optic Components. <br />All optical fiber connectors shall be of industry standard LC Angled polished APC, type for single-mode <br />optical fiber and shall meet or exceed the applicable provisions of TIA/EIA-455-2C (FOTP-2), Impact Test <br />Measurements for Fiber-Optic Devices, TIA/EIA-455-5B (FOTP-5), Humidity Test Procedure for Fiber-Optic <br />Components, and TIA/EIA-455-34A (FOTP-34), Interconnection Device Insertion Loss Test. When tested <br />in accordance with FOTP –2, the connector assembly will be subjected to ten impact cycles by being <br />dropped from a height of 1.5 m. The maximum insertion loss measured before and after the impacts shall <br />be < 0.50 dB. The mean insertion loss of the before and after impacts shall be < 0.30 dB. The insertion <br />loss increase measured before and after the impacts shall be < 0.30 dB. The maximum reflectance <br />measured before and after the impacts shall be < - 40 dB. When tested in accordance with FOTP – 5, the <br />connector assembly will be subjected to test conditions of 75 °C and 95% relative humidity for 7 days. <br />Measurements of loss and reflectance will be made at the beginning of the test, at a minimum of six-hour <br />intervals during the test, and at the end of the test. The maximum insertion loss measured before, during <br />or after the test shall be < 0.50 dB. The mean insertion loss of the before, during or after the test shall be <br />< 0.30 dB. The insertion loss increase measured before, during or after the test shall be < 0.30 dB. The <br />maximum reflectance measured before, during or after the test shall be < - 40 dB.
The URL can be used to link to this page
Your browser does not support the video tag.