My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3346
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2022 12:47:27 PM
Creation date
6/7/2022 12:24:39 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3346
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Aecom Technical Svcs, Inc. for Professional Consulting Svcs, for development of parks & recreation master plan.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br />City of Sunny Isles Beach — Recreation and Parks Master Plan <br />Scope of Work <br />05/05/2022 <br />stakeholders and focus group participants, booking of meeting facilities, and provision of <br />presentation equipment. AECOM and subconsultants will develop template outreach <br />materials such as flyers, posters, social media draft posts, and FAQs. AECOM will be <br />responsible for the Spanish translations of outreach materials and Virtual Open House <br />content. The City will be responsible for the Russian translations of all materials and <br />virtual content, and AECOM will incorporate the translations into the outreach materials, <br />virtual open house content, and engagement questions. <br />2.2 Statistically Valid Public Survey — AECOM will work with the City to prepare a statistically <br />valid mail/telephone survey focusing on the parks, facility and trail needs, usage, and <br />priorities of residents. AECOM and subconsultant ETC will detail the methodology of the <br />survey and work with the City in the development of the questions. A draft survey instrument <br />of the statistically valid survey will be provided to the City for review prior to administration of <br />the survey and may not exceed six pages in length. Techniques utilized for administration of <br />survey will include mail, telephone and a website. The statistically valid survey will have a <br />minimum guaranteed sample size of 300 with a level of confidence of 95% and margin of <br />error of ±5.5% at the City level. The survey will include a set of important/unmet needs <br />matrices, and national benchmarking, tailored to the questions of the survey. Survey results <br />will be geocoded and include cross -tabulations that show results for key demographic <br />groups and other variables desired by the City. ETC will manage the printing, mailing and <br />analysis of all surveys. A final survey report will be provided in printed ;and digital format with <br />key findings, cross -tabulations, maps and question results. <br />Specific survey topics or questions may include: <br />• Park and program participation access/barriers; <br />• Preference for walkability/access standards; <br />• Needs/priorities for athletic programming and/or facilities; <br />• Preferences for non -vehicular connectivity; <br />• Prioritization of potential actions; and <br />• Willingness to pay for priorities/actions. <br />2.3 Online Survey — AECOM will host a web -based survey on the Project Website which will <br />allow for the cross-checking of public input results with statistically valid and online <br />responses. Though not statistically valid itself, the on-line survey results will help to identify <br />and verify trends within the City for usage, importance, barriers to use, communications, <br />funding, priorities and demographics. The survey would be available in three languages — <br />English, Spanish and Russian. AECOM will be responsible for the Spanish translations of <br />the survey. The City will be responsible for the Russian translations of the survey questions, <br />and AECOM will incorporate the translations into the survey. <br />2.4 Service Area Analysis — AECOM will work with City staff to verify existing Cultural and <br />Community Services access standards in coordination with current NRPA and <br />
The URL can be used to link to this page
Your browser does not support the video tag.