Laserfiche WebLink
Manuel G. Vera Jr., PSM <br />Surveyor & Mapper <br />Manuel G. Vera & Associates, Inc. | 1 <br />Project Experience <br />FDOT District 4, Bridges of the Isles & Sunrise Key Bridge Replacements- SR 842/Las Olas <br />Project improvements include demolishing and replacing the bridges at Royal Palm Drive, Nurmi <br />Drive, Fiesta Way, and Isle of Venice and the bridge at Sunrise Key Boulevard, preserving and <br />reusing the historic bridge urns and pedestals on the Las Olas Isles bridges, installing recessed <br />low-level lighting similar to the existing lighting, widening the traffic lanes on the Las Olas Isles <br />bridges to 10 feet and widening the sidewalks to 6 feet, and widening the traffic lanes on the <br />Sunrise Key Boulevard bridge to 11 feet and widening the sidewalk to 7 feet. MGV was <br />responsible for providing up to eleven (11) Utility Locates. Each locate (test hole) included <br />horizontal coordinates, depth of cover, elevation, size, type, material, and general direction of <br />each utility. <br /> FDOT District 4, Districtwide Continuing Services for Survey, Mapping, and SUE (C-9T24) <br />Task driven contract performing miscellaneous Survey and Mapping services in Broward, Indian <br />River, Martin, Palm Beach, and St. Lucie Counties, and all municipalities within the district. <br />Services include, but are not limited to: Field Surveys, Historical Baseline and Existing Right of <br />Way Determination, Global Positioning System (GPS) Surveys, Monumentation Surveys, <br />Bathymetric Surveys (which includes single beam, multi beam and side scanner sonar <br />capabilities), Utility Designation and Excavation (including Underwater Utilities), Tree Surveys <br />(trees identified by an Arborist or Landscape Architect), Right of Way Control Survey Maps, Right <br />of Way Maps, Maintenance Maps, Right of Way Monumentation Maps, Boundary Surveys, <br />Quality Assurance Reviews, Expert Witness Testimony, Title Search Plotting Maps, Title <br />Document Review and Analysis, Sketches, Parcel Staking, and Legal Descriptions. <br /> <br />FDOT District 4, SR 9 (I-95) Express Lanes Phase 3C Design-Build <br />This project is Phase 3C of the Department's overall Phase 3 implementation of Express Lanes <br />along the I-95 Corridor within Broward and Palm Beach Counties. "95 Express" is a Limited <br />Access Express Lane facility that runs adjacent to the I-95 General Use Lanes. The construction <br />limits extend from south of Hollywood Boulevard at I-95 milepost 1.773 to south of Broward <br />Boulevard at I-95 milepost 10.757 in Broward County for a total distance of approximately 9 miles <br />along I-95. The Project also includes improvements along I-595 from west of SR-7 at milepost <br />8.515 to I-95 at milepost 10.545 for a total distance of approximately 2 miles, direct connections <br />between northbound and southbound 95 Express Lanes and I-595 to and from the west, and the <br />painting of 17 existing steel bridges within the I-95/SR 84 and I-95/I-595 Interchanges. MGV is <br />responsible for providing survey and mapping services, including: the establishment of horizontal <br />(NAD 83/90) and vertical control (NAVD 88) networks, topographic/DTM (3D) survey, bridge <br />surveys which include a complete structural control survey of the bridge deck and bottom, <br />supplemental bridge surveys as needed, geotechnical support, and work zone safety. <br /> <br />Design Build Criteria Package for the Dadeland South Intermodal Station Project <br />MGV was responsible for the establishment of horizontal (NAD 83/90) and vertical control (NAVD 88) networks. The survey baseline and <br />right of way were established along the South-Dade Transitway and all intersecting side streets. Topographic and DTM Survey was <br />performed from right of way to right of way along the project limits and all intersecting side-streets. Check cross sections were performed. <br />A drainage survey was performed within the project limits, and identified the type of structure, rim elevation, pipe invert elevation, pipe <br />materials, direction, size, and condition. Survey consisting of field locations of section corners, 1/4-section corners, and fractional corners <br />as well as block closures, monument lines, etc., was performed in order to establish the right of way lines along all intersecting side- <br />streets. Work zone safety was provided, and PNC sheets were prepared. A bridge survey was also performed on the Northbound <br />entrance to SR 826 over the existing transit corridor and the Metrorail bridges over Datran Drive. MGV also provided Utility Designates <br />(Horizontal Mapping) throughout the project limits. Utility scans were performed within a 5’ radius of each proposed boring location, <br />including one exploratory test hole completed at the approximate boring location as well as one test hole on each utility detected within <br />5’ radius. A total back of 20 test holes was performed in the following boring locations: Borings for bridge 6 (B-1 to B-6), Borings for walls <br />2 (WB-1 and WB-2), and Percolation Tests 2 (P-1 and P-2). <br />Office Location <br />Miami, Florida <br /> <br />Years of Experience <br />38 <br /> <br />Years with MGV <br />38 <br /> <br />Education <br />Bachelors of Science, Legal Studies, Nova Southeastern University, 1994 Associates of Science, Land Surveying, Miami Dade College, 1988 <br /> <br />Registrations Professional Surveyor & Mapper, Florida License No.: LS5291 01/05/1994 <br /> <br />Professional Affiliations <br />Florida Surveying & Mapping <br />Society <br /> <br />The Transportation and <br />Expressway Authority <br />Membership of Florida <br /> <br />Surveying Experience <br />Manuel G Vera & Assoc., Inc <br />(1983 - Present) <br /> <br />34 <br />LPOC36007.2022 City of Sunny Isles Beach/ Continuing Services for Landscape Architectural Services/RFQ # 22-06-01